Laserfiche WebLink
ATTACHMENT <br /> PROJECT SCHEDULE <br /> An estimated schedule for completion for the scope of services contained in Attachment 1 is <br /> shown below. The time needed to complete each of the tasks described in Attachment 1 by <br /> Ecotech Consultants, Inc . and the County can be reasonably estimated as shown below with the <br /> limitation that neither the County nor Ecotech Consultants, Inc . can control the phase of the <br /> permitting process controlled by the Florida Department of Environmental Protection, the St. <br /> Johns River Water Management District, or the U. S . Army Corps of Engineers. <br /> Milestone Estimated Completion Date <br /> Lost Tree Restoration Plan 31 May 2008 <br /> Shoreline Restoration Project 31 January 2009 <br /> Page 3 of 3 <br />