Laserfiche WebLink
ONSITE ELECTRICAL AND STRUCTURAL ENGINEERING SERVICES <br />DURING CONSTRUCTION <br />in PROJECT SCOPE <br />The COUNTY intends to begin construction of the Egret Marsh Regional Stormwater Park <br />(Egret Marsh) in the fall of 2008. The CONSULTANT shall provide onsite electrical and <br />structural engineering inspections as required. Specific tasks follow: <br />2. <br />Task No. 1 — ELECTRICAL AND STRUCTURAL ENGINEERING SITE VISITS DURING <br />CONSTRUCTION AND ASSOCIATED MEMOS — conduct up to four electrical <br />engineering site visits and up to four structural engineering site visits to the project <br />construction site to observe and review project construction activities as relates to <br />electrical and structural issues. One electrical engineering site visit will include project <br />startup. Prepare and submit to the COUNTY, a memo and photographs summarizing <br />observations made during each site visit. <br />The electrical Work included herein is only for electrical and control systems related <br />to the site lighting, the three precast buildings, the offsite pumping station at the Lateral D <br />Canal, and the pump station located near the Final Polishing Pond. <br />The structural Work included herein is only for structural items related to the offsite <br />pumping station at the Lateral D Canal. <br />**END OF ATTACHMENT 1 ** <br />2 <br />M:\OPROP\2008\Indian River County\Egret Marsh EM -3 Amendment#1\Malcolm Pirnie Work Order #3 -EM - AMENDMENT No. i .docx <br />