My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-401
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:47:55 AM
Creation date
10/1/2015 1:10:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
12/09/2008
Control Number
2008-401
Agenda Item Number
8.C.
Entity Name
Malcolm Pirnie Inc.
Subject
Amendment No.1 to Work Order No.3-EM
Egret Marsh Regional Stormwater Park Final Redesign
Area
Egret Marsh Regional Stormwater Park
Supplemental fields
SmeadsoftID
8198
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONSITE ELECTRICAL AND STRUCTURAL ENGINEERING SERVICES <br />DURING CONSTRUCTION <br />in PROJECT SCOPE <br />The COUNTY intends to begin construction of the Egret Marsh Regional Stormwater Park <br />(Egret Marsh) in the fall of 2008. The CONSULTANT shall provide onsite electrical and <br />structural engineering inspections as required. Specific tasks follow: <br />2. <br />Task No. 1 — ELECTRICAL AND STRUCTURAL ENGINEERING SITE VISITS DURING <br />CONSTRUCTION AND ASSOCIATED MEMOS — conduct up to four electrical <br />engineering site visits and up to four structural engineering site visits to the project <br />construction site to observe and review project construction activities as relates to <br />electrical and structural issues. One electrical engineering site visit will include project <br />startup. Prepare and submit to the COUNTY, a memo and photographs summarizing <br />observations made during each site visit. <br />The electrical Work included herein is only for electrical and control systems related <br />to the site lighting, the three precast buildings, the offsite pumping station at the Lateral D <br />Canal, and the pump station located near the Final Polishing Pond. <br />The structural Work included herein is only for structural items related to the offsite <br />pumping station at the Lateral D Canal. <br />**END OF ATTACHMENT 1 ** <br />2 <br />M:\OPROP\2008\Indian River County\Egret Marsh EM -3 Amendment#1\Malcolm Pirnie Work Order #3 -EM - AMENDMENT No. i .docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.