Laserfiche WebLink
{T, -� �, °•aJ. ,ter+ J}� C <br /> Indian River County Sheriffs Office Work 11 . 14 .05 <br /> Proposal Request #6 <br /> Demolition ($22 , 800 . 00 allowance by C . O . # 1 - Total cost $ 30 ,446 . 00) = $ 7 , 646 . 00 <br /> Drywall Patching ($4, 000 . 00 Allowance by C . O . #3 — Total Cost $ 8 , 063 . 00) = $ 4 , 063 . 17 <br /> Re Painting in 911 Area due to changes (Schlitt Inv. # ' s 3178 & 3234) $ 733 . 00 <br /> F .A Parts for 911 Area $ 438 . 70 <br /> Pull & set plumbing fixtures in 911 Area (Southern Plumbing Inv. # ' s 3654 , <br /> 4328 & 4446) $ 408 . 00 <br /> Paint Room Rooms 311 and Crime Scene Lab Room $ 2 , 380 . 00 <br /> Soil Testing @ chiller enclosure $ 468 . 00 <br /> Concrete Testing @ chiller enclosure $ 72 . 00 <br /> Drain Pipe behind chiller enclosure $ 248 , 72 <br /> Sidewalk in front of chiller enclosure $ 700 . 00 <br /> Relocate hose bib at chiller enclosure $ 267 . 00 <br /> Dry Wall Repair in Garage (Phoenix FWO # ' s 8014 & 8015 ) $ 983 .48 <br /> Install VCT in Room # ' s 303 , 308 & 309 $ 858 . 75 <br /> Install VCT in Hall # 306 $ 432 . 00 <br /> Aluminum Canopy @ Garage $221892 . 00 <br /> Footings for canopies $ 35700 . 00 <br /> Remove/Replace Wall Coverings in Lobby $ 3 , 338 . 00 <br /> Replace Door in Room # 695 in Uniform Area $ 298 . 00 <br /> Re-install plexiglass into window on North side $ 159 . 00 <br /> Replace Door into Detectives & Auditorium <br /> Door & Frame Materials $ 877 . 00 <br /> Demo @ door into Auditorium In Demolition $$ Above $ <br /> Installation of frames & Doors TQS $ 418 . 00 <br /> Drywall Patching In Drywall Patch $ $ Above $ <br /> Wood Trim Materials $ 34 . 56 <br /> Wood trim Labor $ 150 . 00 <br /> Labor to Install Fill Behind Chiller $29100 . 00 <br /> Field Supervision/Project Management (2/01 /05 thru 11 /02/05 ) $ 2 , 532 . 23 <br /> Subtotal $ 56 , 197 . 61 <br /> OH & P @ 15 % $ 8 ,429 . 64 <br /> Subtotal $ 64, 627 . 25 <br /> Bond @ 01 % $ 646 . 27 <br /> Proposal Request # 6 Total $659273 .52 <br />