My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-389
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-389
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2016 1:08:54 PM
Creation date
9/30/2015 9:27:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/06/2005
Control Number
2005-389
Agenda Item Number
7.U.
Entity Name
Barth Construction
Subject
Sheriff's Office 911 Center Fourth Amendment
Area
Sheriff's Office 911 Center
Supplemental fields
SmeadsoftID
5296
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{T, -� �, °•aJ. ,ter+ J}� C <br /> Indian River County Sheriffs Office Work 11 . 14 .05 <br /> Proposal Request #6 <br /> Demolition ($22 , 800 . 00 allowance by C . O . # 1 - Total cost $ 30 ,446 . 00) = $ 7 , 646 . 00 <br /> Drywall Patching ($4, 000 . 00 Allowance by C . O . #3 — Total Cost $ 8 , 063 . 00) = $ 4 , 063 . 17 <br /> Re Painting in 911 Area due to changes (Schlitt Inv. # ' s 3178 & 3234) $ 733 . 00 <br /> F .A Parts for 911 Area $ 438 . 70 <br /> Pull & set plumbing fixtures in 911 Area (Southern Plumbing Inv. # ' s 3654 , <br /> 4328 & 4446) $ 408 . 00 <br /> Paint Room Rooms 311 and Crime Scene Lab Room $ 2 , 380 . 00 <br /> Soil Testing @ chiller enclosure $ 468 . 00 <br /> Concrete Testing @ chiller enclosure $ 72 . 00 <br /> Drain Pipe behind chiller enclosure $ 248 , 72 <br /> Sidewalk in front of chiller enclosure $ 700 . 00 <br /> Relocate hose bib at chiller enclosure $ 267 . 00 <br /> Dry Wall Repair in Garage (Phoenix FWO # ' s 8014 & 8015 ) $ 983 .48 <br /> Install VCT in Room # ' s 303 , 308 & 309 $ 858 . 75 <br /> Install VCT in Hall # 306 $ 432 . 00 <br /> Aluminum Canopy @ Garage $221892 . 00 <br /> Footings for canopies $ 35700 . 00 <br /> Remove/Replace Wall Coverings in Lobby $ 3 , 338 . 00 <br /> Replace Door in Room # 695 in Uniform Area $ 298 . 00 <br /> Re-install plexiglass into window on North side $ 159 . 00 <br /> Replace Door into Detectives & Auditorium <br /> Door & Frame Materials $ 877 . 00 <br /> Demo @ door into Auditorium In Demolition $$ Above $ <br /> Installation of frames & Doors TQS $ 418 . 00 <br /> Drywall Patching In Drywall Patch $ $ Above $ <br /> Wood Trim Materials $ 34 . 56 <br /> Wood trim Labor $ 150 . 00 <br /> Labor to Install Fill Behind Chiller $29100 . 00 <br /> Field Supervision/Project Management (2/01 /05 thru 11 /02/05 ) $ 2 , 532 . 23 <br /> Subtotal $ 56 , 197 . 61 <br /> OH & P @ 15 % $ 8 ,429 . 64 <br /> Subtotal $ 64, 627 . 25 <br /> Bond @ 01 % $ 646 . 27 <br /> Proposal Request # 6 Total $659273 .52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.