My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-025
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 2:17:09 PM
Creation date
9/30/2015 10:32:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/23/2007
Control Number
2007-025
Agenda Item Number
7.T.
Entity Name
Turner Construction Co.
Subject
Change Order No.004 Guaranteed Maximum Price
Area
Emergency Operations Center 43rd Ave.
Project Number
5054
Supplemental fields
SmeadsoftID
6086
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OFFICE OF THE <br /> AD3HNISTRA TION B UILDING PROJECT MANAGER <br /> November. 307 2006 <br /> To : Tom Frame <br /> Re : EOC PO #0004#4057-02 Mod <br /> Tom <br /> We need to process the attached PO modification. The original request was in error. Typo etc. <br /> - This one is correct. It does not change the GMP as this amount was the one included originally in <br /> the GMP. <br /> Sincerely, <br /> '� . <br /> Steve Blum, Architect <br /> Project Manager <br /> Enclosures: PO Change request, with backup. <br /> 1840 2P Stree4 Vero Beach, n 32960-3365 <br /> Voice: (772) 567-8000 Fat #1531 Fax.- (772) 978-,1781 <br /> Suncom224-1531 e-mail: shlumaircgov. com <br />
The URL can be used to link to this page
Your browser does not support the video tag.