My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-092
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 11:33:18 AM
Creation date
9/30/2015 10:39:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
03/13/2007
Control Number
2007-092
Agenda Item Number
7.P.
Entity Name
Turner Construction
Subject
Change Order No.006
Revose Keying Schedule Permanent Power Site
Area
Indian River County Emergency Operations Center
Supplemental fields
SmeadsoftID
6212
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal <br /> 940 Williston Park Point <br /> Lake Mary, Florida 32746 <br /> Phone (407) 8069911 Fax (407) 708-5888 dobr4fbi.com <br /> SOLD TO: PROJECT: <br /> Turner Construction Indian River County EOC <br /> 800 North Magnolia Ave Suite 500 <br /> Orlando, FL 32803 <br /> Atm : Karen Berg Job Number: OFFER GOOD FOR 30 DAYS FROM THE ABOVE DATE. <br /> Date: 15-Feb-2007 Phone: Fax: <br /> To Furnish and Install the Following Per Plans and Specifications: Dated: <br /> Deleting Shaw 24" Embody Carpet Tile from Rm #'s 4 & 37 ONLY 90 Sy ✓ -1 ,812.60 <br /> NOTED_0_ADDENDUMS Contract Total: .$1 ,812.60 <br /> Karen , <br /> Please call me if you have any questions. <br /> Thanks, <br /> John Prudot <br /> Project Manager <br /> Florida Business interiors <br /> Our price does not include tWolloroing: <br /> * Removal of existing floor and disposal <br /> * Floor Prep Not Included — To Be Done On T & M Basis or Quoted * Furniture moving <br /> *Hauling debris or cleanup of other trades * Floor waving/vacuuming <br /> * Correcting any asbestos conditions that may exist * Second or third shift work <br /> * Unforeseeable conditions that may be discovered after existing floor covering is removed <br /> Thank you for requesting our proposal. <br /> Authorized igna ure <br /> ACCEPTED BY: <br /> J. David O'Bryan If <br /> DATE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.