My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-114
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2016 2:10:55 PM
Creation date
9/30/2015 10:41:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/03/2007
Control Number
2007-114
Agenda Item Number
7.M.
Entity Name
Turner Construction Company
Subject
Change Order No. 009 Change Order No. 004 Change Order No.003
DataCom conduit work fire suppression system COR 015
Area
Emergency Operation Center 43rd Ave.
Supplemental fields
SmeadsoftID
6237
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Turner <br /> Mr. Steve Blum <br /> IRC Project Manager <br /> Indian River County Emergency Operations Center <br /> 2625 19th Avenue <br /> Vero Beach , FL 32960 <br /> RE: Indian River County Emergency Operations Center <br /> 2625 19th Avenue <br /> Vero Beach , FL 32960 <br /> Proiect #: 1290700 <br /> Change Order Request Number 013 <br /> Revision 3 - Delete Fypon , add Ice Machine connections, modify front <br /> entrance, revise kitchen casework <br /> Dear Mr. Blum, <br /> We have. finalized the required quotations for PCO-003 for the following extra work: Revision 03 <br /> documents. We have reviewed the Subcontractor Proposals (copies attached hereto) and have <br /> verified that all extra work items are in compliance with our Contract Agreement. The following is <br /> a detailed itemization of all extra costs : <br /> PCO No Item No Description Amount Contractor <br /> 003 001 provide additional drain and cw services as $2,602 .00 COAMEC <br /> shown on SKP-1 and SKP-2 and as required <br /> to connect and make fully functional the <br /> owner supplied ice machine <br /> 003 002 provide additional electrical service as shown $215 .00 COMELE <br /> on SKE-3.4 and as required to connect and <br /> make fully functional the owner supplied ice <br /> machine <br /> 003 003 provide changes in dimensions to main entry $1 ,276.00 COMELE <br /> as shown on attached documents <br /> 003 004 provide changes to the drywall scope of work ($4,563.00) MADSOU <br /> as shown on the attached documents: delete <br /> all remaining fypon; upgrade the computer <br /> room south wall <br /> 003 005 provide changes to the casework scope of ($548 .00) DIMCAB <br /> work as shown on the attached documents <br /> 003 006 provide changes to the acoustical ceiling $284 .00 HANACO <br /> scope of work as shown on the attached <br /> documents : add hold down clips on ACT in <br /> Computer Room , #004 <br /> 003 007 provide changes to the lighting and low $974.00 T&TCON <br /> voltage stub up scopes of work as shown on <br /> the attached documents <br /> 003 608 _GeaetaLCotaditiens 49°0 ---TUReeN <br /> 003 009 Fund through Owner Contingency ($264 .00) INDRIV <br /> Total Change to GMP: No Change $0.00 <,O Qgd.LV;�> <br /> This change will also result in a possible schedule impact of 0 days to the project. er'bo') <br /> COR-013 N/-/ ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.