My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-114
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2016 2:10:55 PM
Creation date
9/30/2015 10:41:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/03/2007
Control Number
2007-114
Agenda Item Number
7.M.
Entity Name
Turner Construction Company
Subject
Change Order No. 009 Change Order No. 004 Change Order No.003
DataCom conduit work fire suppression system COR 015
Area
Emergency Operation Center 43rd Ave.
Supplemental fields
SmeadsoftID
6237
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PCo -LP 3cp <br /> EAST COAST FIRE <br /> PROTECTION Iso Certified <br /> 2280 <br /> ified <br /> 2280 Old Lake Mary Road • Sanford, FL 32771 <br /> 407.688. 1949 • Fox. 407 .688.4393 • www.ecfp. com March 2212007 <br /> Turner Construction Company, Inc. <br /> 4225 43rd Avenue <br /> Vero Beach, FL 32967 <br /> Attn : Ms, Karen Berg <br /> Subject: Revised RFP No. PCO - 030 <br /> Reference : IRC Emergency Operations <br /> Dear Ms, Berg : <br /> Please find our scope and revised pricing for PCO-030 listed below. <br /> Scope of Work: <br /> 1 . Furnish and install two (2) additional smoke detectors below the floor of <br /> room number 004. Two detectors are required below the floor so cross <br /> zoning below the floor can be achieved . <br /> 2 . Furnish and install one discharge nozzle below the floor in room number <br /> 004 and furnish new nozzle for ceiling per the hydraulic calculations . <br /> 3 . Run new hydraulic calculation and modify the drawings to reflect piping <br /> network changes. <br /> 4. Revise drawings to show all changes required to discharge piping network <br /> and the changes to the detection and control . <br /> 5 . Resubmit the drawings to you for engineer review. <br /> 6 . Resubmit drawings to Indian River County for revision to permit. <br /> Total Additional Cost. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,012 . 00 <br /> Atlanta 9 Baltimore • Chantilly • Charlotte • Chesapeake • Orlando • Raleigh • Richmond • Roanoke <br />
The URL can be used to link to this page
Your browser does not support the video tag.