Laserfiche WebLink
r <br /> CHANGE ORDER BREAKDOWN <br /> DATE: 3/12/2007 <br /> CHANGE ORDER # 7 REVISED <br /> FROM: COMPLETE ELECTRIC <br /> PROJECT NAME: TURNER CONSTRUCTION - INDIAN RIVER COUNTY EMERGENCY OPS CENTER <br /> PCO #002 <br /> OMIT CHANGES BETWEEN BASE BID AND THIS CHANGE ORDER. <br /> WORK THE ROOM IN WHICH THE 4" CTV CONDUIT IS TO BE LOCATED HAS CHANGED <br /> DESCRIPTION: INSTEAD OF THE CONDUIT ENTERING ROOM 037 IT NOW ENTERS ROOM 004. <br /> THIS CONDUIT BETWEEN ROOM 037 AND THE EAST OF THE BUILDING FOOTER <br /> WAS ALREADY INSTALLED UPON RECEIPT OF THIS CHANGE ORDER <br /> ADD (4) 4" CONDUITS. (2) RUN TO THE SE PROPERTY CORNER. THE OTHER <br /> (2) RUN TO THE PROPERTIES NE CORNER FOR TELEPHONE SRVC ENTRANCES <br /> (2) 4" RACEWAYS AND (2) 2" RACEWAYS THAT WERE TO BE RUN FROM ROOM <br /> 037 TO THE S SIDE OF THE PROPERTY, ARE NOT APPEARING ON THE <br /> DRAWING DATED 8-29-06. WE HAVE CREDITED BACK THE PORTION OF <br /> THESE RUNS THAT IS ON THE EXTERIOR OF THE BLDG. THE PORTION <br /> UNDER THE BLDG WAS IN PLACE AT THE TIME THIS CHANGE WAS RECVD. <br /> DELETE (4) 4" AND (2) 211, THESE RACEWAYS WERE TO BE RUN FROM ROOM <br /> 004 TO THE SE CORNER OF THE PROPERTY <br /> DELETE (3) JUNCTION BOXES AT SW PROPERTY CORNER <br /> SUPPLY AND INSTALL (4) 4" AND (2) 2" RACEWAYS FROM ROOM 004 TO <br /> JUNCTION BOX LOCATED E OF THE PARKING AREA. <br /> SUPPLYAND INSTALL (2) 4" AND (2) 2" RACEWAYS FROM E PARKING JUNCTION <br /> BOX TO EXISTING BOX AT S SIDE OF PROPERTY. <br /> SUPPLY AND INSTALL (2) 4" RACEWAYS FROM E PARKING JUNCTION BOX <br /> TO EXISTING JUNCTION BOX ON N SIDE OF PROPERTY <br /> WE ARE NOT GOING TO EXTEND THE 2" CONDUITS FOR THE NEWS TRUCKS <br /> AS IT SHOWS ON THE PRINTS T-1 DATED 8-29-06 <br /> EXTEND (4) 419 AND (2) 2" CONDUITS TO ANTENNA TOWER FROM "INSTALL <br /> TO DATE" LOCATION <br /> LABOR CREDITS FOR THE NEWS TRUCK IS INCLUDED <br /> MATERIALS: 1 - 50X32X24 BOX WITH COVER X $984.00 = $984.00 <br /> .91 PULL LINE 200LB X $29.38 = $26.73 <br /> 2 - 2" GRC COUPLINGS X $2.68 = $2.68 <br /> 8 - 4" GRC COUPLING X $9.97 = $79.76 <br /> 4 - 2"X12" GRC NIPPLE X $5.07 = $20.28 <br /> 16 - 4"X12" GRC NIPPLE X $19.72 = $315.52 <br /> 24 - 4" PLASTIC BUSHING X $1 .09 = $26. 16 <br /> 3620 - 4" PVC 40 X $2.94 = $10,642.80 <br /> 35.01 - ALL WEATHER CLEAR CEMENT X $19.80 = $693. 19 <br /> 6 - 2" PVC MALE TERM X $.74 = $4.44 <br /> 42 - 4" PVC 90 ELBOW X $14.69 = $616.98 <br /> IS -2" PVC ELBOW X $2.77 = $49.86 <br /> 20 - 4" PVC MALE TERM X $2.94 = $58.80 <br /> 884 - 2" PVC X $.76 = $671 .84 <br /> S - 2" PLASTIC BUSHINGS X $.36 = $2.88 <br /> 110 - 4" PVC COUPLING X $2.34 = $257.40 <br /> 8 - 4" PVC FEMALE ADAPTOR X $2.43 = $19.44 <br /> 42 - 2" PVC COUPLING X $.51 = $21 .42 <br /> 2 - 2" PVC FEMALE ADAPTOR X $.74 = $1 .48 <br /> 340' - 2" PVC X $.68 = $231 .20 <br /> 680' - 4" PVC X $1 .60 = $1088.00 <br /> CREDITS <br /> .67 - PULL LINE X $29.37 = ($19.67) <br /> 2 -2" GRC 90 ELBOW X ($22.76) <br /> 4 - 4" GRC 90 ELBOW X 52.83 = ($211 .32) <br /> 6 - 2" PLASTIC BUSHING X $.36 = ($2. 16) <br /> 10 - 4" PLASTIC BUSHING X $1 .09 = ($10.90) <br />