My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/7/1961
CBCC
>
Meetings
>
1960's
>
1961
>
3/7/1961
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2020 9:37:54 AM
Creation date
6/10/2015 10:17:19 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/07/1961
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. 61-15 <br />.;WHEREAS, the State Road Department of the State of Florida <br />is now in process of preparing its annual Budget for the year 1961-62, <br />and, <br />WHEREAS the Board of County Commissioners of Indian River <br />County is vitally interested in the additions, extensions and improvements <br />to the primary road system of the State of Florida in Indian River County, <br />Now therefore, <br />BE IT RESOLVED by the Board'of County Commissioners of Indian <br />River County, Florida that this Boardbdoes herewith respectfully request <br />the State Road Department of Florida to include in its Budget for primary <br />roads for the year 1961-62 the following projects in Indian River County, <br />Florida, to -wit: <br />1. The four-laning and improving of State Road 5 on its <br />appropriate right of way into a modern and adequate four lane highway from <br />the North limits .of the City of Vero Beach to Wabasso. <br />2. The construction of an adequate two-lane highway to be <br />known as A -1-A from the North limits of said highway to the Sebastian <br />Inlet. <br />3. State Road 60 from the present Eastern terminus at 502 <br />to the Atlantic dcean, widen and construct. <br />4. The reconstruction and improvement into a modern and <br />adequate two lane highway of all of State Road 510 from State Road 5 to <br />the Atlantic Ocean including a new bridge over the Indian River. <br />5. Rebuild Section 88540, State Road S-512 from State Road <br />60 to the Sugar Mill. <br />6. The construction of a bridge over the Sebastian Inlet. <br />7. Resurface present two lane SRS from North City Limits of <br />Vero Beach to Wabasso. . <br />8. Construct new bridge on SR 512 approx. 1/2 mile East of the <br />intersection of SR 510 and SR 512 on"a new alignment juet South of present <br />location and to permit 3,000 cu. Ft./Sec of flow under bridge. River t� <br />be a flood plain for a 200; foot width under bridge. <br />
The URL can be used to link to this page
Your browser does not support the video tag.