My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-093
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2016 11:35:47 AM
Creation date
9/30/2015 8:32:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
03/15/2005
Control Number
2005-093
Agenda Item Number
14.B.5
Entity Name
ERC General Contracting
Subject
Landfill Gas Control System (SWD)
Area
Indian River County Landfill
Project Number
5091
Archived Roll/Disk#
4001
Supplemental fields
SmeadsoftID
4829
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERC GENERAL CONTRACTING SERVICES , INC . <br /> Ect �c <br /> Carter CommerCenter 890 Carter Road , Suite 170 <br /> Winter Garden , Florida 34787 <br /> (407) 656-3900 • Fax (407 ) 656-2128 <br /> January 20 , 2005 <br /> Martin Lewis P . E . <br /> Camp Dressor & McKee <br /> 1701 Highway A- 1 - A, Suite 301 <br /> Vero Beach , Florida 32963 <br /> RE : HURRICANE REPAIRS <br /> Dear Martin : <br /> The costs for the additional work requested and the work completed on a Time and Material <br /> Basis to date is $ 35 ,488 . 51 . Seethe attached breakdown of the work showing the following : <br /> 1 . Computer replacement . <br /> 2 . Sump Pump Modification above the flood zone . <br /> 3 . UPS System <br /> 4 . Enhanced hurricane shutters <br /> The required time of completion is as follows : <br /> Board Approval : 3 weeks <br /> Submittal Preparation and approval : 3 weeks <br /> UPS system parts ordering time after approval : 3 weeks <br /> Installation site time : 2 weeks <br /> The total time required for this installation is 11 weeks . We will however begin submittal <br /> preparation immediately getting all the drawings to you for approval prior to Board Approval . It <br /> is probable that the time line can be cut in half to 6 weeks given quick turn around on submittal <br /> approvals . For purposes of the change order I have used the 11 weeks time line . <br /> Attached is a completed change order form with the 1 1 week extension from todays date . <br /> Sincerely , <br /> Jerry L . Pinder <br /> President , ERC <br />
The URL can be used to link to this page
Your browser does not support the video tag.