My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-175
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2016 12:01:09 PM
Creation date
9/30/2015 6:41:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/22/2003
Control Number
2003-175
Agenda Item Number
7.H.
Entity Name
Seimens Building Technologies
Subject
Expansion of Closed Circuit TV Monitoring System
Area
IRC Courthouse
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3313
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 WARRANTY/GUARANTEE <br /> 6 . 1 CONTRACTOR warrants and guarantees to OWNER that all materials will be new <br /> unless otherwise specified and that all work will be of good quality and free from defects <br /> and in accordance with the Specifications . <br /> 6 . ,CONTRACTOR 2 ACTOR agrees to remedy promptly and without ` dst` to OWNER, any <br /> defective "materials or workmanship which appear within ; a cine (I) year period after the <br /> date ©f final acceptance by the OWNER of the CONTR) d1b S, work. All. equipment' <br /> not manufactured by' CONTRACTOR carries only such warranty '- as given by the <br /> manufacturet thereof and which is hereby assigned "to the OW1lER " without recourse to <br /> ' 41AACTOR. <br /> 6 . 3 No provision contained in these Specifications shall be held to limit <br /> CONTRACTOR' S liability for defects to less than the legal limit of liability in <br /> accordance with law. <br /> 6 . 4 No provision contained in these Specifications shall be held to limit the terms and <br /> conditions of the Manufacturer's Warranty and CONTRACTOR shall secure parts , <br /> materials and equipment to be installed with Manufacturer' s full warranty as to parts and <br /> service for one (1) year wherever possible . <br /> 6 . 5 As- Built Drawing Requirements : <br /> Prior to final acceptance , the CONTRACTOR shall submit to the OWNER three <br /> (3 ) sets of As Built Plans and technical submittals for each major <br /> component/equipment installed . This plan set shall show the exact way in which <br /> the installation was constructed, including all changes during the course of the <br /> proj ect . <br /> 6 . 5 . 3 The CONTRACTOR shall correct any errors to the As-Built plans upon review by <br /> the OWNER before Final Acceptance is complete . <br /> 7.0 INTENTIONALLY OMITTED <br />
The URL can be used to link to this page
Your browser does not support the video tag.