Laserfiche WebLink
ARTICLE 7 CONTRACTOR'S REPRESENTATIONS <br />In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br />representations: <br />7.1 CONTRACTOR has familiarized itself with the <br />nature and extent of the Contract <br />Documents, work, site, <br />locality, and all local conditions and laws and <br />regulations that in <br />any manner may affect <br />cost, progress, performance <br />or furnishing of the <br />work. <br />7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br />conditions and drawings of physical conditions which are identified in the Supplementary <br />Conditions as provided in Paragraph 4.02 of the General Conditions, and accepts the <br />determination set forth in Paragraph SC -4.02 of the Supplementary Conditions of the <br />extent of the technical data contained in such reports and drawings upon which <br />CONTRACTOR is entitled to rely. <br />7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br />obtaining and carefully studying) all such examinations, investigations, explorations, tests, <br />reports and studies (in addition to or to supplement those referred to in Paragraph 7.2 <br />above) which pertain to the subsurface or physical conditions at or contiguous to the site <br />or otherwise may affect the cost, progress, performance or furnishing of the work as <br />CONTRACTOR considers necessary for the performance of furnishing of the work at the <br />Contract Price, within the Contract Time and in accordance with the other terms and <br />conditions of the Contract Documents, including specifically the provisions of Paragraph <br />4.02 of the General Conditions; and no additional examinations, investigations, <br />explorations, tests, reports, studies or similar information or data are or will be required by <br />CONTRACTOR for such purposes. <br />7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on <br />the Contract Documents with respect to existing underground facilities at or contiguous to <br />the site and assumes responsibility for the accurate location of said underground facilities. <br />No additional examinations, investigations, explorations, tests, reports, studies or similar <br />information or data in respect of said underground facilities are or will be required by <br />CONTRACTOR in order to perform and furnish the work at the Contract Price, within the <br />Contract Time and in accordance with the other terms and conditions of the Contract <br />Documents, including specifically the provisions of Paragraph 4.04 of the General <br />Conditions. <br />7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br />investigations, explorations, tests, reports and studies with the terms and conditions of the <br />Contract Documents. <br />7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or <br />discrepancies that he has discovered in the Contract Documents and the written <br />resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />ARTICLE 8 CONTRACT DOCUMENTS. <br />The Contract <br />Documents <br />which <br />comprise <br />the <br />entire agreement between OWNER and <br />CONTRACTOR <br />concerning <br />the work <br />consist of <br />the <br />following: <br />00530-5 <br />F:\Utilities\UTILITY - ENGINEERING\Projects - Utility Constriction Permits\IRC - SR 60 66th Ave. to 82nd Ave. Utility Conflict <br />Resolutions UCP#3026\A1 - 00530 COMPLETED Agreement between Owner Contractor Rev 061807.doc <br />