Laserfiche WebLink
Exhibit "A " <br /> To Amendment No . 4 <br /> Exhibit Pavilion At Fairgrounds/Hobart Park <br /> " Scope of Work" <br /> Items to be Added to the GMP : <br /> 1 . Add 600 if of floor striping to designate access and egress pathways per Building <br /> Department . <br /> 2 . Deduct the existing Landscape Allowance . PCL has been informed that the County <br /> will perform this work. <br /> 3 . Obtain NPDES permit . This is a new permit requirement effective May 1 , 2003 . <br /> The following items are Not included : <br /> 1 . Concrete :drive approach located on the south side of the building. <br /> 2 . Roof and Siding Insulation. <br /> 3 . Monitoring well and water testing for NPDES permit . <br /> 4 . Galvanizing of structural beams and columns <br /> 5 . Epoxy paint on structure. <br /> 6 . Lightning protection. <br /> 7 . Floor sealing. <br /> 8 . Mitered end sections for ADS pipe, inline ADS drains, and ADS drain basis as <br /> indicated on Civil drawings dated February 11 , 2003 "Not for Construction. " <br /> 9 . ( 1 ) 8 " GRS Gate Valve per planning department review comments is not included. <br /> 10 . Landscaping & irrigation. <br /> 11 . Chain link fencing. <br /> Clarifications : <br /> 1 . Galvanizing of purlins and gurts only. Galvanized surfaces will not be painted. <br /> Structural steel will be primed and painted with approved Sherthane 2K paint product <br /> on columns and Spraylastic on the beams . <br /> 2 . Site office is not included . The County is to provide space in the existing trailer <br /> located on the Fairgrounds . <br /> 3 . Temporary toilet facilities are not included. The County is to provide access to <br /> existing restrooms located on the fairgrounds . <br /> 4 . Indian River County will perform the scopes of landscaping and chain link fencing . <br /> These activities shall be coordinated with PCL ' s Site Superintendent in order <br /> maintain the project completion date. <br /> 5 . Foundation costs associated with the increase of the Importance Use Factor will be <br /> submitted under a separate cover. <br /> The total value for this additional work will be Negative Six thousand Four Hundred Ninety <br /> Seven dollars ($6, 497. 00) . This price will be valid for no more than 60 days . Schedule attached <br /> represents duration and sequencing of work only. <br /> 7J <br />