My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-180
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2016 1:01:14 PM
Creation date
9/30/2015 6:41:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/22/2003
Control Number
2003-180
Agenda Item Number
11.I.4
Entity Name
PCL
Subject
Amendment No. 4/PCL Construction Services, Inc.11.I.4
Archived Roll/Disk#
3162
Supplemental fields
SmeadsoftID
3320
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit "A " <br /> To Amendment No . 4 <br /> Exhibit Pavilion At Fairgrounds/Hobart Park <br /> " Scope of Work" <br /> Items to be Added to the GMP : <br /> 1 . Add 600 if of floor striping to designate access and egress pathways per Building <br /> Department . <br /> 2 . Deduct the existing Landscape Allowance . PCL has been informed that the County <br /> will perform this work. <br /> 3 . Obtain NPDES permit . This is a new permit requirement effective May 1 , 2003 . <br /> The following items are Not included : <br /> 1 . Concrete :drive approach located on the south side of the building. <br /> 2 . Roof and Siding Insulation. <br /> 3 . Monitoring well and water testing for NPDES permit . <br /> 4 . Galvanizing of structural beams and columns <br /> 5 . Epoxy paint on structure. <br /> 6 . Lightning protection. <br /> 7 . Floor sealing. <br /> 8 . Mitered end sections for ADS pipe, inline ADS drains, and ADS drain basis as <br /> indicated on Civil drawings dated February 11 , 2003 "Not for Construction. " <br /> 9 . ( 1 ) 8 " GRS Gate Valve per planning department review comments is not included. <br /> 10 . Landscaping & irrigation. <br /> 11 . Chain link fencing. <br /> Clarifications : <br /> 1 . Galvanizing of purlins and gurts only. Galvanized surfaces will not be painted. <br /> Structural steel will be primed and painted with approved Sherthane 2K paint product <br /> on columns and Spraylastic on the beams . <br /> 2 . Site office is not included . The County is to provide space in the existing trailer <br /> located on the Fairgrounds . <br /> 3 . Temporary toilet facilities are not included. The County is to provide access to <br /> existing restrooms located on the fairgrounds . <br /> 4 . Indian River County will perform the scopes of landscaping and chain link fencing . <br /> These activities shall be coordinated with PCL ' s Site Superintendent in order <br /> maintain the project completion date. <br /> 5 . Foundation costs associated with the increase of the Importance Use Factor will be <br /> submitted under a separate cover. <br /> The total value for this additional work will be Negative Six thousand Four Hundred Ninety <br /> Seven dollars ($6, 497. 00) . This price will be valid for no more than 60 days . Schedule attached <br /> represents duration and sequencing of work only. <br /> 7J <br />
The URL can be used to link to this page
Your browser does not support the video tag.