My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-180
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2016 1:01:14 PM
Creation date
9/30/2015 6:41:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/22/2003
Control Number
2003-180
Agenda Item Number
11.I.4
Entity Name
PCL
Subject
Amendment No. 4/PCL Construction Services, Inc.11.I.4
Archived Roll/Disk#
3162
Supplemental fields
SmeadsoftID
3320
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Activity Activity Orig Rem . % Early Early <br /> ID Description Dur. <br /> Dur IJ Start ' Finish <br /> 7�' 4- <br /> !120 27 a <br /> 0160 ESTABLISH TEMPORARY 1 1 0 07AUG03 07AUG03 ESTABLISH TEMPORARY CONTROLS <br /> 0180 EXCAVATE STORMWATER 3 3 0 08AUG03 12AUG03 I EXCAVATE STORMWATER POND <br /> 0170 CLEAR & GRUB SITE 1 1 0 08AUG03 08AUG03 _— -- — ! OCLEAR & GRUB SITE <br /> GRADE & COMPACT BUIILDI G FOUNDATION — <br /> 0190 GRADE & COMPACT BUILDING 5 5 0 13AUG03 19AUG03 i � � I �- <br /> 0200 FORM BUILDING SLAB 3 3 0 20AUG03 22AUG03 I I FORM BUILDING SLAB <br /> 0280 INSTALL WATER MAIN 5 5 0 20AUG03 26AUG03 <br /> j � � <br /> I" INSTALL WATER MAIN <br /> 0320 UNDERGROUND ELECTRICAL 3 3 0 22AUG03 26AUG03 UNDERGROUND ELECTRICAL <br /> 0220 INSTALL FOOTING 3 3 0 25AUG03 27AUG03 INSTALL FOOTING REINFO,RC ING / ANCHOR BOLTS - j <br /> 0210 INSTALL VAPOR BARRIER 1 1 0 27AUG03 27AUG03 ` INSTALL VAPOR BARRIER <br /> 0290 BACTERIOLOGICAL TESTING & 20 20 0 27AUG03 23SEP03 i BACTERIOLOGICA TESTING & ASBUILTS -. %m <br /> 0230 INSTALL WWM 2 2 0 28AUG03 29AUG03 I i fll STALL WWM <br /> 0240 POUR MONOLITHIC SLAB 1 1 0 01SEP03 01SEP03 <br /> (POUR MONOLITHIC SLAB <br /> 0250 SOFT CUT SLAB 1 1 0 01 SEP03 01 SEP03 SOFT CUT SLAB <br /> --- -- — -- <br /> 260 REMOVE FORMWORK 1 1 0 02SEP03 02SEP03ilREMOVE FORMWORK <br /> 0310 DELIVERY OF BUILDING 0 0 0 02SEP03 DELIVERY OF BUILDING <br /> 0460 SHAKE OUT BUILDING STEEL 2 2 0 03SEP03 04SEP03 I SHAKE OUT BUILDING STEEL <br /> 0330 ERECT STRUCTURE 10 10 0 05SEP03 18SEP03 ERECT STRUCTURE. <br /> 0630 WATER MAIN COMPLETE 1 1 0 24SEP03 24SEP03 ; WATER MAIN COM Eo- <br /> 0340 PAINT STRUCTURE 3 3 0 19SEP03 23SEP03 I PAINT STRUCTURE <br /> 0350 INSTALL METAL ROOFING AND 9 9 0 22SEP03 020CT03 IINI TALL METAL ROOFING AND SIDING <br /> 0360 INSTALL ELECTRICAL ROOM 3 3 0 030CT03 070CT03 ; INSTALL ELECTRICAL ROOM <br /> 0620 TRIM OUT METAL BUILDING 3 3 0 030CT03 070CT03 j TRIM OUT METAL BUILDING <br /> 0270 INSTALL ADS/STORM PIPING 5 5 0 08OCT03 140CT03 i INSTALL ADS/STORM PIPING <br /> 0370 SET ELECTRICAL 3 3 0 080CT03 100CT03 I SET ELECTRICAL PANELBOARDSR- <br /> 0380 ABOVE GROUND ELECTRICAL 4 4 0 130CT03 160CT03 ABOVE GROUND ELECTRICAL ROUGH IN� <br /> 0410 FINISH GRADE SITE 2 2 0 150CT03 160CT03 i FINISH GRADE SITE- - - <br /> 0390 PULL ELECTRICAL WIRE 3 3 0 170CT03 21OCT03 I PULL ELECTRICAL WIRES i <br /> 0440 LANDSAPE & IRRIGATION 5 5 0 170CT03 230CT03 I LANDSAPE & IRRIGATION <br /> 0420 INSTALL INSTALL GRAVEL DRIVE 2 2 0170CT03 20OCT03 I INSTALL GRAVEL DRIVE} T. <br /> Start Date 19FEB03 Early Bar IRCP Sheet 2 of 3 <br /> Finish Date 31 UO3 <br /> ala Dale 09JUL03 Progress Bar <br /> PCL CONSTRUCTION SERVICES , INC. Date Revision Checked Approved <br /> D <br /> Run Date 09JUL03 16: 13 Critical Activity INDIAN RIVER COUNTY EXHIBIT PAVILION <br /> Classic Schedule Layout <br /> © Primavera Systems , Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.