Laserfiche WebLink
Exhibit- C <br /> Estimated Cost - 12 " Water Main (Master Plan) <br /> B1712" <br /> Water Main 17th Street (Master Plan) 1 550 LF $ 65 $ 1003750 <br /> Water Main Directional Bore 90 LF $ 335 $30150 <br /> Amamm $ 130, 900 <br /> Contingency @ 10% $ 132090 <br /> 3% Survey $ 3, 927 <br /> Design @ 5 % $ 6, 545 <br /> Permitting @ 2% $22618 <br /> Bidding & Award @ 2% $23618 <br /> Construction Services @ 3% $ 3927 <br /> Administration @ 2% $2, 618 <br /> Bonding @ 2% $2, 618 <br /> $ 168 , 861 <br /> Developers Share $28, 913 <br /> @ (l 11 . 25/LF lVatei) <br /> NMI $ 139, 948 <br /> ro <br /> N <br />