Laserfiche WebLink
DELIVERY, STORAGE AND HANDLING <br /> PART 1 : GENERAL <br /> 1 . 01 SCOPE OF WORK <br /> A . This Section specifies the general requirements for the delivery handling, storage <br /> and protection for all items required in the construction of the work . Specific <br /> requirements , if any, are specified with the related item . <br /> 1 . 02 TRANSPORTATION AND DELIVERY <br /> A . Transport and handle items in accordance with manufacturer's instructions . <br /> B . Schedule delivery to reduce long-term on- site storage prior to installation and/or <br /> operation . Under no circumstances shall equipment be delivered to the site more <br /> than one month prior to installation without written authorization from the <br /> Engineer. <br /> C . Coordinate delivery with installation to ensure minimum holding time for items <br /> that are hazardous , flammable , easily damaged or sensitive to deterioration . <br /> D . Deliver products to the site in manufacturer's original sealed containers or other <br /> packing systems, complete with instructions for handling, storing, unpacking , <br /> protecting and installing . <br /> E . All items delivered to the site shall be unloaded and placed in a manner, which <br /> will not hamper the Contractor's normal construction operation or those of <br /> subcontractors and other contractors and will not interfere with the flow of <br /> necessary traffic . <br /> F . Provide necessary equipment and personnel to unload all items delivered to the <br /> site . <br /> G. Promptly inspect shipment to assure that products comply with requirements , <br /> quantities are correct, and items are undamaged . For items furnished by others <br /> (i . e . Owner, other Contractors) , perform inspection in the presence of the <br /> Engineer. Notify Engineer verbally, and in writing, of any problems . <br /> 1 . 03 STORAGE AND PROTECTION <br /> A. Store and protect products in accordance with the manufacturer' s instructions , <br /> with seals and labels intact and legible . Storage instruction shall be studied by the <br /> Contractor and reviewed with the engineer by him/her. Instruction shall be <br /> carefully followed and a written record of this kept by the Contractor. Arrange <br /> storage to permit access for inspection . <br /> B . Store loose granular materials on solid flat surfaces in a well - drained area . <br /> Prevent mixing with foreign matter. <br /> 6706 -38666\2/5 /04 Page 25 of 59 VRB <br />