Laserfiche WebLink
SECTION 00470 SCHEDULE OF COST FOR <br /> MAJOR STRUCTURES AND/OR AREAS OF WORK <br /> To assist in the evaluation of the Successful Bidder's Bid and his qualifications to perform the work under <br /> the Contract, the Successful Bidder shall submit within seven (7) days of written request from the <br /> OWNER, the following breakdown to show his allocation among the general items which comprise the <br /> LUMP SUM PRICE for the BASE BID : <br /> Unit Unit Price Total <br /> 1 ) Mobilization <br /> 2 ) Demobilization <br /> 3 ) Site Preparation <br /> 4) Transplanted Landscape Plants <br /> a) Root Prune per Live Oak <br /> b) Root Prune per Queen Palm <br /> c) Root Prune per Cabbage Palm <br /> d) Transplant per Live Oak <br /> e) Transplant per Queen Palm <br /> f) Transplant per Cabbage Palm <br /> TOTAL <br /> 5 ) Fellsmere Irrigation System improvements (Allowance) $ 5 , 000 $ 5 , 000 <br /> 6 ) Roseland Irrigation System Installation <br /> a) Pump and Controller <br /> b) Distribution system piping and sprinklers <br /> TOTAL <br /> 7) Fellsmere Landscape Maintenance (3 -year) <br /> 8 ) Roseland Landscape Maintenance (3 -year) <br /> 9) Miscellaneous Work and Cleanup <br /> TOTAL BASE BID $ <br /> Notes : <br /> ( 1 ) It is understood that the allocations of prices listed above which comprise the LUMP SUM BID <br /> for the BASE BID are part of the Proposal and will be used in evaluation of the Successful <br /> Bidder's Bid and are binding upon the CONTRACTOR. <br /> (2) " Miscellaneous Work" included in the above items is : fabricated metals; testing; clean-up ; and any <br /> Work, materials and equipment that may reasonably be inferred from the Contract Documents as <br /> being required to produce the intended result will be supplied whether or not specifically called <br /> for. <br /> * * END OF SECTION <br /> 6706 -38666\2/5/04 00470- 1 VRB <br />