My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-240
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 10:59:46 AM
Creation date
9/30/2015 8:17:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
10/12/2004
Control Number
2004-240
Agenda Item Number
11.J.6
Entity Name
Post, Buckley, Schuh & Jernigan
Subject
Addendum No. 4 Utility Master Plan
Area
Fellsmere/Pine Grove Development
Archived Roll/Disk#
3224
Alternate Name
PBS&J
Supplemental fields
SmeadsoftID
4574
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum No.4 OA `2grj <br /> ORIGINAL. Scope of Services <br /> Indian River County <br /> Department of Utility Services <br /> Fellsmere/Pine Grove Appendix <br /> General <br /> PBS&J has been providing Master Planning and Hydraulic Modeling services to Indian River County <br /> Department of Utility Services (the COUNTY) under Addendum No . 1 and Addendum No . 2 to the <br /> September 4, 2001 Master Utility Plan Update Contract. The County has requested that PBS&J evaluate <br /> the potential to serve the Fellsmere/Pine Grove Development as a part of the on-going Master Plan <br /> Update . The County currently provides the City of Fellsmere (the CITY) limited bulk sewer service and <br /> has an emergency interconnect in place to provide potable water service if needed . Changes in drinking <br /> water standards, large scale planned growth, and other factors may affect the ability of City of Fellsmere <br /> to adequately provide service to its growing population . The County has shown interest in providing bulk <br /> water and wastewater service to meet all of the CITY ' s existing (current County commitments) and future <br /> water demands and wastewater flows but not a retrofit of the CITY . PBS &J will evaluate the impact of <br /> extending the County ' s water and wastewater service areas to include the Fellsmere/Pine Grove <br /> Development according to the following scope of services . <br /> Scope of Work <br /> The purpose of this planning effort is to analyze the impact of providing bulk service to <br /> the <br /> Fellsmere/Pine Grove Development on the Master Plan Update recommendations that were being updated <br /> exclusive of the City of Fellsmere or any other large bulk service customer . The County requested that <br /> PBS &J analyze two scenarios : 1 ) What level of service can be provided by the current Master Plan <br /> Update recommendations and 2) what transmission and treatment improvements would be necessary to <br /> incorporate the Fellsmere/Pine Grove Development water demands and wastewater flows as projected by <br /> others . The task of analyzing the reclaimed water system/treated wastewater disposal was not included in <br /> this authorization . Also , the retrofit of existing CITY customers and future growth within the CITY but <br /> not included in the reports by Masteller & Moler, Inc . and Hartman & Associates , Inc . was not included <br /> in this analysis . <br /> A technical memorandum (TM), which will be included as a separate appendix of the Master Plan <br /> Update, shall address the following major tasks : <br /> • Gather and evaluate data from Water Capacity Study/Report for the Pine Grove Development <br /> by Masteller & Moler, Inc . <br /> • Gather and evaluate data from City of Fellsmere CDBG Wastewater Transmission System <br /> Report by Hartman & Associates, Inc . <br /> 0 Develop feasible integrated water supply and treatment and wastewater collection and <br /> treatment alternatives . <br /> • Evaluate the water distribution and wastewater collection systems to accommodate the <br /> projected flows, from studies by others , within various service alternatives and the limits of <br /> County hydraulic standards . <br /> Pagel of 3 <br /> • <br /> U:\WO\Projects\IRCOUNTY\IRC_Utility_MasterPlan\01 Proposals\ l . ] Proposals\PBSJ-Scope_FellsmereASA4. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.