My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-147
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2016 1:53:01 PM
Creation date
10/1/2015 12:09:40 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/13/2008
Control Number
2008-147
Agenda Item Number
8.F.
Entity Name
Masteller, Moler, Reed & Taylor
Subject
Work Order No.4 CR 512 Phase V
Area
I-95 to Broadway St. Fellsmere
Project Number
0445
Supplemental fields
SmeadsoftID
7013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Work Order #4 <br /> County Road 512 Ph. 5 <br /> Topo Survey <br /> May 1 , 2008 <br /> Page 7 of 7 <br /> TIME FOR COMPLETION & DELIVERABLEWWORK PRODUCT <br /> • Survey shall be completed within one hundred twenty ( 120) business days from Notice to Proceed. <br /> • The SURVEYOR shall provide the survey in the following format: <br /> • Cover sheet with survey notes, certifications, location sketch and other pertinent data. <br /> • Survey horizontal and vertical control sheets. <br /> • Subsequent Topographic sheets. <br /> • The SURVEYOR shall provide the COUNTY with a preliminary (N- 90%) survey within sixty (60) days from the <br /> notice to proceed for review and comments. The COUNTY shall have 30 business days to review and comment. <br /> We propo o erform the above describe pe of services for a lump sum fee of $ 44,200.00. <br /> t <br /> 4/8/2008 <br /> David aylor, Vice President Date <br /> Maste , Moler, Reed & Tac. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.