Laserfiche WebLink
Table VI - 7 provides a comparison of the current IRC LOS , the LOS standard , the average <br /> LOS of other Florida counties , and the standards established by the FLA . It should be <br /> noted that IRC ' s current LOS in terms of library facilities , materials , and computers <br /> ranges from 24 percent to 43 percent above the average LOS of other Florida counties . <br /> Table VI -7 <br /> Comparison of Current LOS and LOS Standards <br /> ( Per 1 , 000 Residents ) <br /> Per 1 ,000 Residents - <br /> % ifference : <br /> IRC Avg of Other IRC Existing <br /> Existing FL Counties LO 3 & Other FLA LOS <br /> LOS Measure LOS ( ) LOS (2) Flori a Counties Standards (3) <br /> Library Buildings ( sq . feet) 5801 438 24 % 1 600 to 1 , 000 <br /> Library Materials (4) 1 3 , 2001 11982 38 % 1 2 , 000 to 4 , 000 <br /> Computers 0 . 71 0 . 4 43 % 1 0 . 3 to 1 . 0 <br /> ( 1 ) Source : Table VI -4 <br /> ( 2 ) Includes all Florida counties , except for IRC . Source : Department of State — Division of <br /> Library & Information Services , 2002 Library Directory with Statistics <br /> (3 ) Source : Table VI -5 <br /> (4 ) Library materials for IRC include books , CDs , DVDs , videos , print and online resource <br /> subscriptions . Library materials for other counties include books , serial subscriptions , <br /> audio and video volumes . <br /> Note : IRC figures are for 2004 while the figures for other Florida counties are for 2002 . <br /> Cost Component <br /> Library capital costs consist of four components : buildings , land , materials , and <br /> equipment. Facility costs are based on the projected cost to add the next library building <br /> ( includes building and land cost) , while the cost of library materials and equipment is <br /> based on the average replacement cost per unit, provided by the IRC Division of Library <br /> Services . <br /> Buildings and Land <br /> The following two tables provide unit costs for buildings and land . Since replacement <br /> costs for the existing buildings were not readily available , building costs were determined <br /> from recent expansions and future planned expansions , as presented in Table VI - 8 . The <br /> construction cost ranges from $ 135 to $ 189 per square foot, while the furniture and <br /> equipment cost ranges from $48 to $ 114 per square foot . According to IRC Library <br /> System representatives , the relatively high cost of the Main Library expansion was due to <br /> a more sophisticated building structure , high demolition costs in preparation for <br /> expansion, and relatively high furniture and equipment costs . <br /> Tindale -Oliver & Associates , Inc . Indian River County <br /> May 2005 VI -9 Impact Fee Study <br />