My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-169a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-169a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 11:11:28 AM
Creation date
9/30/2015 8:44:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Interlocal Agreement
Approved Date
05/17/2005
Control Number
2005-169A
Agenda Item Number
9.A.1
Entity Name
Tindale-Oliver
Subject
Impact Fee Study Interlocal Agreement
Supplemental fields
SmeadsoftID
4919
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table VIII =5 <br /> Building and Land Replacement Cost( ' ) <br /> Year Number Squa a Building <br /> Facility Description Acquired/Built of Acres Feetl Land Cost Replacement Cost <br /> Sheriffs Administration Building 1988 N/A 33 ,332 N/A $4, 3331160 <br /> Sheriffs Fleet Compound 1988 N/A 8 , 956 N/A $ 19164 ,280 <br /> Sheriffs Crime Scene Evidence Addition 2003 N/A 1 ,000 N/A $ 130 ,000 <br /> Miscellaneous Buildings on Site« : <br /> Base N/A N/A 264 N/A $ 34, 320 <br /> Storage Bldg. N/A N/A 11000 N/A $ 130,000 <br /> Office Space N/A N/A 11743 N/A $2265590 <br /> Office Space N/A N/A 888 N/A $ 115 ,440 <br /> Land for Sheriffs Admin. Bldg.(3) 1983 9 . 81 1 N/A $343 , 175 N/A <br /> Total 9,811 479183 $343, 175 $69133 ,790 <br /> Total Cost $6 ,4765965 <br /> Number of Officers 185 <br /> Avera a Building Replacement Cost per Officer $35 ,011 <br /> ( 1 ) Source : Public Works Department and Office of Management and Budget, IRC <br /> (2 ) Total cost of miscellaneous buildings was provided by IRC . In order to estimate the <br /> replacement cost, a unit cost per square foot was calculated and then multiplied by the square <br /> footage for each miscellaneous building . <br /> ( 3 ) The Correctional Facility Detention Complex and the Sheriffs Administration Building are <br /> located at the same site . Based on the review of aerial photos included in the "Needs <br /> Assessment and Master Plan for the Correctional Facility , " it was determined that each <br /> occupies approximately 50% of the site . <br /> The historical cost for the equipment, as provided by the IRCSO , is $ 8 . 9 million . The <br /> replacement value for these items was not available . Using historical (acquisition) <br /> values , however, results in a conservative estimate of equipment cost . Table VIII - 6 <br /> presents the equipment cost per police officer and includes : <br /> • vehicles ; <br /> • radio equipment ; <br /> • vehicle equipment ; <br /> • weapons ; <br /> • office equipment ; <br /> • specialty vehicles/equipment; <br /> • electronic equipment ; <br /> • computer equipment ; and <br /> • miscellaneous equipment . <br /> The total cost was obtained from the IRCSO " Asset Report by Asset # , " and the figures <br /> were prorated between correctional facilities and law enforcement facilities based on <br /> information provided by the IRCSO staff. <br /> Tindale -Oliver & Associates , Inc . Indian River County <br /> May 2005 VIII - 7 Impact Fee Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.