My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-169a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-169a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 11:11:28 AM
Creation date
9/30/2015 8:44:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Interlocal Agreement
Approved Date
05/17/2005
Control Number
2005-169A
Agenda Item Number
9.A.1
Entity Name
Tindale-Oliver
Subject
Impact Fee Study Interlocal Agreement
Supplemental fields
SmeadsoftID
4919
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table IX - 2 provides a summary of the cost per square foot by school type , as well as the <br /> cost per student station, based on the current LOS for each school type . The result is a <br /> weighted average cost per student station of $ 21 , 897 . <br /> Table IX =2 <br /> Facility Cost per Student Station <br /> Elementary Middle High Weighted <br /> Cost Component School School School Average <br /> Square Feet per Student Station (LOS )( ' ) 144 . 711 117 . 261 147 . 571 139 . 07 <br /> School Facility Cost Components : <br /> Construction Cost per Square Foot(2 ) $92 . 56 $ 131 . 81 $ 138 . 60 $ 128 .31 <br /> Design Cost per Square Foot(3 ) $4 . 63 $6 . 59 $6 .93 $6 .42 <br /> Engineering Cost per Square Foot(4) $0.46 $0 . 66 $0. 69 $0 .64 <br /> Utilities Connection Cost per Square Foot(4) $0 .46 $0 . 66 $0 . 69 $0 .64 <br /> FF&E Cost per Square Foot(5) $ 8 . 33 $ 11 . 86 $ 12 . 47 $ 11 . 55 <br /> Land Cost per Square Foot(6) $8 . 58 $ 11 . 09 $9 . 74 $9 . 89 <br /> Total Facility Cost per Square Foot $ 115 . 02 $ 162 . 67 $ 169 . 12 $ 157 .45 <br /> Facility Cost per Student Station(7) $ 16,644 . 54 $ 19 , 074. 68 $24,957 . 04 $21 , 897 . 13 <br /> ( 1 ) Source : Table IX- 1 <br /> (2 ) Source : Florida Department of Education maximum construction cost per student station <br /> factors for January 2005 , based on Consumer Price Index . Includes construction of facility <br /> only - furniture and equipment not included in cost . <br /> ( 3 ) Design costs based on 5 percent of the total construction cost per square foot, based on <br /> information provided by the IRC School District on recent schools constructed in IRC . <br /> (4 ) Engineering and utility connection costs based on 0 . 5 percent of the total construction cost <br /> per square foot, based on information provided by the IRC School District on recent <br /> schools constructed in IRC . <br /> ( 5 ) FF&E costs based on 9 percent of the total construction cost per square foot, based on <br /> information provided by the IRC School District on recent schools constructed in IRC . <br /> (6) Based on a cost of $ 34 , 136 per acre using recently purchased vacant land parcels of 40 to <br /> 130 acres ( Source : Appendix B , Table B -2 ) . The land cost per acre is then multiplied by 20 <br /> acres per elementary , 40 acres per middle, or 80 acres per high school . Land cost per <br /> square foot is determined by multiplying the prototypical number of acres for each school <br /> type by the cost per acre of $34 , 136 and dividing by the average square footage per school <br /> type ( 81 , 164 square feet for elementary , 123 , 123 for middle, and 279 ,294 for high schools ) . <br /> The average square footage by school type is calculated by multiplying the square feet per <br /> student station by the maximum number of student stations for new schools , per IRC <br /> School District . <br /> ( 7 ) Total facility cost per square foot multiplied by the number of square feet per student <br /> station (Item 1 ) for each school type . <br /> Tindale -Oliver & Associates , Inc . Indian River County <br /> May 2005 IX - 7 Impact Fee Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.