Laserfiche WebLink
INDIAN RIVER COUNTY UTILITIES <br />ROCKRIDGE SEWER COLLECTION REHABILITATION <br />TABLE 3: ESTIMATE FOR VACUUM COLLECTION SYSTEM <br />ASSUMPTIONS <br />16TH ST <br />15TH PL <br />8" <br />300 <br />300 <br />Project Number: <br />$45 <br />071415.03 <br />6TH AVE <br />8 INCH SERVICE CONNECTION EA. HOME <br />15TH PL <br />6" <br />Date <br />of Esitmate: <br />Ln Ft <br />14 -Mar -05 <br />$12,000 <br />1 COLLECTION <br />CHAMBER PER 4 HOMES - <br />6TH AVE <br />Estimate <br />By: <br />600 <br />DBS <br />$35 <br />SOME ROCK EXCAVATION <br />MAY BE <br />REQUIRED <br />15TH ST <br />4" <br />520 <br />520 <br />Ln Ft <br />$35 <br />GRADE IN <br />AREA IS ESSENTIALLY <br />FLAT <br />16TH ST <br />4" <br />520 <br />520 <br />Ln Ft <br />$35 <br />ITEM <br />FROM <br />TO <br />PIPE <br />LENGTH <br />UNIT <br />520 <br />UNITS <br />UNIT <br />ITEM <br />DESCRIPTION <br />16TH ST <br />15TH ST <br />SIZE <br />OF RUN <br />QTY <br />Ln Ft <br />$35 <br />COST <br />COST <br />16TH ST <br />15TH ST <br />4" <br />(inches) <br />(feet) <br />Ln Ft <br />$35 <br />$18,200 <br />WEST of 3RD AVE <br />16TH ST <br />PIPING NORTH OF <br />17TH STREET <br />520 <br />520 <br />Ln Ft <br />$35 <br />$18,200 <br />15TH ST <br />3RD AVE <br />4TH CT <br />EAST of 6TH AVE <br />N END <br />17TH ST <br />4" <br />520 <br />520 <br />Ln <br />Ft <br />$35 <br />$18,200 <br />EAST of 5TH CT <br />N END <br />17TH ST <br />4" <br />520 <br />520 <br />Ln <br />Ft <br />$35 <br />$18,200 <br />5TH AVE <br />N END <br />17TH ST <br />4" <br />520 <br />520 <br />Ln <br />Ft <br />$35 <br />$18,200 <br />17TH ST <br />5TH AVE <br />6TH AVE <br />4" <br />550 <br />550 <br />Ln <br />Ft <br />$35 <br />$19,250 <br />PIPING BETWEEN <br />16TH AND 17TH STREETS <br />14TH ST <br />15TH ST <br />4" <br />520 <br />520 <br />Ln Ft <br />$35 <br />16TH PL <br />W END <br />6TH AVE <br />4" <br />600 <br />600 <br />Ln <br />Ft <br />$35 <br />$21,000 <br />6TH AVE <br />17TH ST <br />16TH ST <br />4" <br />650 <br />650 <br />Ln <br />Ft <br />$35 <br />$22,750 <br />WEST of STH CT <br />17TH ST <br />16TH ST <br />4" <br />520 <br />520 <br />In <br />Ft <br />$35 <br />SIA 9nn <br />WEST of 5TH AVE <br />17TH ST <br />16TH ST <br />4" <br />600 <br />600 <br />Ln <br />Ft <br />$35 <br />$21,000 <br />WEST of 4TH CT <br />17TH ST <br />16TH ST <br />4" <br />520 <br />520 <br />Ln <br />Ft <br />$35 <br />$18,200 <br />WEST of 4TH AVE <br />17TH ST <br />16TH ST <br />4" <br />520 <br />520 <br />Ln <br />Ft <br />$35 <br />$18,200 <br />WEST of 3RD CT <br />17TH ST <br />16TH ST <br />4" <br />520 <br />520 <br />Ln <br />Ft <br />$35 <br />$18,200 <br />16TH ST <br />E. 3RD CT <br />5TH AVE <br />4" <br />800 <br />800 <br />Ln <br />Ft <br />$35 <br />$28,000. <br />16TH ST <br />5TH AVE <br />6TH AVE <br />6" <br />600 <br />600 <br />Ln <br />Ft <br />$35 <br />$21,000 <br />16TH ST <br />W END <br />6TH AVE <br />4" <br />600 <br />600 <br />Ln <br />Ft <br />$35 <br />$21,000 <br />PIPING BETWEEN 15TH AND 16TH STREETS <br />6TH AVE <br />16TH ST <br />15TH PL <br />8" <br />300 <br />300 <br />Ln Ft <br />$45 <br />$13,500 <br />6TH AVE <br />15TH ST <br />15TH PL <br />6" <br />300 <br />300 <br />Ln Ft <br />$40 <br />$12,000 <br />NORTH of 15TH PL <br />W END <br />6TH AVE <br />4" <br />600 <br />600 <br />Ln Ft <br />$35 <br />$21,000 <br />WEST of 5TH CT <br />16TH ST <br />15TH ST <br />4" <br />520 <br />520 <br />Ln Ft <br />$35 <br />$18,200 <br />WEST of 5TH AVE <br />15TH ST <br />16TH ST <br />4" <br />520 <br />520 <br />Ln Ft <br />$35 <br />$18,200 <br />WEST of 4TH CT <br />16TH ST <br />15TH ST <br />4" <br />520 <br />520 <br />Ln Ft <br />$35 <br />$18,200 <br />WEST of 4TH AVE <br />16TH ST <br />15TH ST <br />4" <br />520 <br />520 <br />Ln Ft <br />$35 <br />$18,200 <br />WEST of 3RD CT <br />16TH ST <br />15TH ST <br />4" <br />520 <br />520 <br />Ln Ft <br />$35 <br />$18,200 <br />WEST of 3RD AVE <br />16TH ST <br />3RD CT <br />4" <br />520 <br />520 <br />Ln Ft <br />$35 <br />$18,200 <br />15TH ST <br />3RD AVE <br />4TH CT <br />4" <br />650 <br />650 <br />Ln Ft <br />$35 <br />$22,750 <br />15TH ST <br />4TH CT <br />6TH AVE <br />6" <br />900 <br />900 <br />Ln Ft <br />$40 <br />$36,000 <br />PIPING BETWEEN 13TH AND 15TH STREETS <br />WEST of 6TH AVE <br />14TH ST <br />15TH ST <br />4" <br />700 <br />700 <br />Ln Ft <br />$35 <br />$24,500 <br />WEST of 5TH CT <br />14TH ST <br />15TH ST <br />4" <br />520 <br />520 <br />Ln Ft <br />$35 <br />$18,200 <br />W EST of 5TH AVE <br />14TH ST <br />15TH ST <br />4" <br />520 <br />520 <br />Ln Ft <br />$35 <br />$18,200 <br />WEST of 4TH CT <br />13TH ST <br />15TH ST <br />4" <br />1,300 <br />1,300 <br />Ln Ft <br />$35 <br />$45,500 <br />WEST of 4TH AVE <br />13TH ST <br />15TH ST <br />4" <br />1,200 <br />1,200 <br />Ln Ft <br />$35 <br />$42,000 <br />WEST of 3RD CT <br />13TH ST <br />15TH ST <br />4" <br />1,200 <br />1,200 <br />Ln Ft <br />$35 <br />$42,000 <br />3RD CT <br />14TH ST <br />15TH ST <br />4" <br />600 <br />600 <br />Ln Ft <br />$35 <br />$21,000 <br />14TH PL <br />E END <br />3RD CT <br />4" <br />500 <br />500 <br />Ln Ft <br />$35 <br />$17,500 <br />14TH ST <br />E END <br />3RD CT <br />4" <br />650 <br />650 <br />Ln Ft <br />$35 <br />$22,750 <br />NON -PIPING ITEMS REQUIRED <br />4 -INCH DIVISION VALVES <br />15 <br />EACH <br />$1,300 <br />$19,500 <br />6 -INCH DIVISION VALVES <br />10 <br />EACH <br />$1,600 <br />$16,000 <br />8" SERVICE CONNECTIONS <br />TO COLLECTION CHAMBERS <br />413 <br />EACH <br />$1,400 <br />$578,200 <br />COLLECTION CHAMBERS <br />(ONE PER FOUR HOUSEHOLDS) <br />104 <br />EACH <br />$3,500 <br />$364,000 <br />INSPECTION PORTS <br />10 <br />EACH <br />$750 <br />$7,500 <br />VACUUM / PUMP STATION <br />1 <br />EACH <br />$250,000 <br />$250,000 <br />BIOFILTER SYSTEM <br />1 <br />EACH <br />$75,000 <br />$75,000 <br />EMERGENCY GENERATOR/ ATS <br />1 <br />EACH <br />$100,000 <br />$100,000 <br />Air Intake System <br />413 <br />EACH <br />$500 <br />$206,500 <br />building for the vacuum station (24x32) <br />768 <br />SF <br />$135 <br />$103,680 <br />Abandonment of existing septic/wetwells <br />1 <br />LS <br />$175,000 <br />$175,000 <br />Land Cost @ $100,000/acre <br />0.5 <br />EACH <br />$100,000 <br />$50,000 <br />SUBTOTAL <br />$2,692,880 <br />CONTINGENCY <br />20% <br />$538,576 <br />ENGINEERING FEES <br />10% <br />$269,288 <br />TOTAL (Rounded value) <br />_ <br />$3,500,000 <br />' <br />PER <br />SERVICE <br />$8,475 <br />