Laserfiche WebLink
�a��can / Warden <br /> JULY 21 , 2006 <br /> Construction <br /> Na BILL MCCAIN, P.E. Lc.# CU-C057427 <br /> MCCAIN & ASSOCIATES <br /> 1171 19THSTREET <br /> VERO BEACH, FL 32961 <br /> SUBJECT: OAK ISLAND <br /> PER YOUR REQUEST OUR ITEMIZED ACCOUNTING OF THE COSTS WHICH <br /> WERE INCURRED BY OUR FORCES DUE TO THE CHANGE IN ALIGNMENT OF <br /> THE OFFSITE GRAVITY SEWER. <br /> AS YOU ARE AWARE, THIS ALIGNMENT CHANGE PLACED THE NEW <br /> GRAVITY SEWER WITHIN ONE TO TWO FEET FROM THE EXISTING POWER <br /> TRANSMISSION POLE AND ALSO CLOSER TO THE EXISTING 16" WATER <br /> TRANSMISSION MAIN. <br /> 27 HOURS WELLPOINT SYSTEM @ 95 .00 2565 . 00 <br /> 27 HOURS TRACK EXCAVATOR W/OPERATOR @ 95 .00 2565 . 00 <br /> 27 HOURS 3 YARD LOADER W/OPERATOR @ 90.00 2430.00 <br /> 27 HOURS 5 TON VIBRATORY ROLLER W/OPERATOR @ 75 . 00 2025 .00 <br /> 3 DAYS 2 TRUCKS WITH HAND TOOLS @75 .00 EACH 450.00 <br /> 3 DAYS SUPERVISION @ 276. 00 828. 00 <br /> 54 HOURS SKILLED LABOR @ 28. 00 1512 .00 <br /> 54 HOURS LABOR @ 21 .00 1134.00 <br /> COST FROM FPL FOR SUPPORT OF UTILITY POLE <br /> SEE ATTACHED CHECK 4625 .00 <br /> TOTAL 177684.00 OR <br /> 17, 500. 00 <br /> SHOULD FURTHER INFORMATION BR REQUIRED, PLEASE DO NOT <br /> HESITATE TO CONTACT OUR OFFICE. <br /> RESPECTFULLY SUBMITTED, <br /> 'ARD CONSTRUCTION <br /> JO HUY <br /> PRESIDENT <br /> Jobear / Warden • 1950 Danr Drive • Palm Bay, FL 32905 • Ofc : (321 ) 723 -3571 • Fax : (321 ) 728-5619 <br />