9. WORK PROGRESS SCHEDULE <br /> The Work Progress Schedule shall be in the form of a bar graph showing the time allotted for each of <br /> the various activities of work. The Schedule shall show the various activities of work in sufficient <br /> detail to demonstrate that the CONTRACTOR has a reasonable and workable plan to complete the <br /> Project within the Contract Period. The Schedule shall show the order and interdependence of <br /> activities and the sequence in which the work is to be accomplished as planned by the <br /> CONTRACTOR. All activities shall be described so that the work is readily identifiable and the <br /> progress on each activity can be readily measured. Each activity shall show a beginning work date, <br /> and duration. Activities shall include procurement time for materials, plants and equipment, and <br /> review time of shop drawings where they are appropriate and essential to the timely completion of <br /> the Project. The list of activities shall include milestones when required by the Plans or the Contract <br /> Documents. Sufficient liaison shall be conducted and information provided to indicate coordination <br /> of activities with utility owners having facilities within the Project limits . <br /> The Schedule shall be reviewed by the COUNTY at the Pre-Construction Meeting and shall become <br /> part of the Contract Documents. If the Schedule submitted is determined to be inadequate by the <br /> COUNTY, it shall be returned to the CONTRACTOR for correction. The CONTRACTOR shall <br /> have fifteen ( 15) calendar days from the date of transmittal to submit a corrected schedule. When <br /> approved, this original schedule shall constitute the baseline against which progress is measured . <br /> The CONTRACTOR shall submit an updated Work Progress Schedule only when requested by the <br /> COUNTY. If revisions are required to the Work Progress Schedule, the CONTRACTOR shall <br /> furnish revised charts and analysis within 21 calendar days after being notified by the COUNTY. <br /> Failure to finalize either the initial or a revised Schedule in the time specified shall result in <br /> withholding of all Contract Payments until the Schedule is approved. <br /> 10. PERMITS, LICENSES , CERTIFICATIONS, APPROVALS, AND EASEMENTS <br /> The CONTRACTOR shall comply with all the requirements of the permits, easements, and <br /> conditions of this contract including the Florida Department of Environmental Protection (FDEP) <br /> Permit 0166929-001 -JC Variance 0166929-007-EM and Permit 0215960-001 -JC, the U. S. Army <br /> Corps of Engineers (USACE) Permit 2000- 1872 and 2003 -6106, the National Marine Fisheries <br /> Service Regional Biological Opinion on Hopper Dredging = <br /> and the State <br /> Sovereign Submerged Lands Easement (Appendices B, C, D, and E respectively). The <br /> CONTRACTOR shall conspicuously post copies of all permits on the job site. Any other licenses or <br /> approvals required for the execution of this work shall be secured and paid for by the <br /> CONTRACTOR as specified in Article 7-2 of the General Provisions. The CONTRACTOR shall <br /> obtain any and all U. S. Coast Guard dredge certifications and/or approvals. Copies of all required <br /> U. S . Coast Guard certification or approval must be provided at the Pre-Construction Meeting. <br /> Temporary Easements and Agreements for Beach Restoration with property owners in the project <br /> area have been obtained by the COUNTY for work as specified in these Technical Specifications <br /> and in the Construction Plans. <br /> 10. 1 Hopper Dredge Requirements. If the CONTRACTOR elects to use a hopper dredge, it is a <br /> requirement that the work plan incorporates all applicable requirements of the USACE, <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS ". . : ` TS-5 <br />