My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-136
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 10:51:23 AM
Creation date
9/30/2015 10:44:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
04/17/2007
Control Number
2007-136
Agenda Item Number
7.T.
Entity Name
Great Lakes Dredge and Dock Co.
Subject
Beach Restoration - Sectors 1,2, 7 Ambersand Beach
First Amendment to Agreement
Area
Ambersand Beach
Project Number
0502
Bid Number
2006047
Supplemental fields
SmeadsoftID
6262
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 . 1 . 1 . 1 Equipment. The CONTRACTOR shall <br /> use a portable nephelometer that meets Environmental <br /> Protection Agency standards to measure turbidity. The nephelometer <br /> shall have been factory calibrated within the last year. The <br /> CONTRACTOR shall use a boat of sufficient size to conduct sampling in <br /> the nearshore waters during the winter and outfitted to meet all safety <br /> requirements of the U . S. Coast Guard. The boat shall possess sufficient <br /> navigational instrumentation (DGPS) to accurately determine the position <br /> of sample points relative to the dredge and the discharge point and an <br /> operational VHF radio and cellular phone for communication with the <br /> dredge and COUNTY staff. <br /> 13 . 1 . 1 .2 Turbidity Monitoring. The CONTRACTOR shall be responsible for <br /> taking turbidity measurements during any construction activity <br /> as described in Section 31 and Appendix F of these Technical <br /> Specifications. The sampling locations must be consistent with the <br /> project permits, specifically with the Water Quality Monitoring Required <br /> Section of the Florida DEP permit. <br /> 13 . 1 . 121 Borrow Site. The CONTRACTOR shall <br /> conduct turbidity monitoring <br /> at the borrow site every six (6) hours during dredging <br /> operation with the first sample taken within 1 hour following <br /> commencement of each dredging cycle. ..__ <br /> s <br /> The CONTRACTOR : ; ; shall collect <br /> Background and Compliance samples for the c J borrow <br /> site. The Background turbidity sample shall be collected at a <br /> minimum distance of 500 meters ( 1 ,640 feet) up-current from <br /> the dredge and clearly outside of any project-induced turbid <br /> plume. The borrow site Background sample shall be <br /> collected at mid-depth. The Compliance turbidity sample <br /> shall be collected at a maximum distance of 150 meters (492 <br /> feet) down-current from the dredge, in the densest portion of <br /> any visible turbidity plume, and the samples shall be collected <br /> at the surface and mid-depth. <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS - TS-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.