Laserfiche WebLink
13 .2 . 2 . Reef Protection and Monitoring. With the exception of nearshore <br /> hardbottom within the fill template, the CONTRACTOR shall avoid <br /> impact to all hardbottom and reef areas during all phases of the project as <br /> outlined in the Technical Specifications. The CONTRACTOR shall be <br /> liable for any non-compliance with the conditions of the permits, <br /> easements and terms of this contract attributable to their personnel or <br /> subcontractors. <br /> 13 .2. 3 Procedures to be implemented to provide the required environmental protection and <br /> to comply with the applicable permits, laws, and regulations. The CONTRACTOR <br /> shall provide written assurance that immediate corrective action will be taken to <br /> correct pollution of the environment due to accident, natural causes, or failure to <br /> follow the procedures set out in accordance with the Environmental Protection Plan. <br /> 13 .2.4 Drawings showing locations of any proposed temporary excavations or <br /> embankments for haul roads, material storage areas, structures, sanitary facilities, and <br /> stockpiles of excess or spoil materials. <br /> 13 .2 . 5 Work Area Plan showing the proposed activity in each portion of the area and <br /> identifying the areas of limited use or nonuse. The Work Area plan should include <br /> measures for marking the limits of use areas. <br /> 13 .2 . 6 A statement identifying person(s) who will be responsible for implementation of the <br /> Environmental Protection Plan. The CONTRACTOR personnel responsible shall <br /> report directly to the CONTRACTOR' S top management and shall have the <br /> authority to act for the CONTRACTOR in all environmental protection matters. <br /> 13 .2 .7 A statement acknowledging that the CONTRACTOR is responsible for <br /> environmental protection, including all of the CONTRACTOR' s personnel and <br /> subcontractors. <br /> 13 .2. 8 The Environmental Protection Plan will be dated and endorsed by the individual in <br /> responsible charge of the construction. <br /> 14. PROJECT SIGNS <br /> Two plywood construction information signs shall be provided and installed by the CONTRACTOR <br /> prior to the start of dredging. No other company sign shall be allowed on site. <br /> The CONTRACTOR shall construct, install and maintain two informational signs with the following <br /> information: <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS ". ,:; TS- 18 <br />