Laserfiche WebLink
52601044 <br /> PROJECT MANAGEMENT <br /> OMM <br /> Pap 2 of e <br /> NHS$ Non- Non- Non- Referenca <br /> SHS NHSI NHS! Federal- Construction <br /> Requirement Reference SNS District Conftct Local FDOT SHS Highway! Local Agency Responsibility Mon <br />itoring � Agency District <br /> Non-SHS Responsibilities (Location in Initial Initial <br /> El Contract) <br /> 3. Bonding 23 CFR Yes you No No The Local Agency shall certify that FDOT Review bid Page 1 , Federal <br /> and t at to Prequalified Contractors will be used to document for Required <br /> Prequalificatim perform LAP projects when on the NHS or inclusion of the Contract <br /> SHS. However, when the project Is on the provision. provisions, <br /> NHS or SHS, and the contrail is under Paragraph 2 <br /> $250,000, then a prequalified contractor Is , fit <br /> not required. Per FDOT Standard <br /> Specifications 2-1 Prequall1kabon of Bidders <br /> 4. Buy 23 CFR Yes Yet Yea Yes include FDOTs Supplemental Specification Review bid Page 19, <br /> America 835.410 8-12.2 in bid document, document for paragraph 17 <br /> Inclusion of the and Page P-18 <br /> specification. arsis <br /> Gilining the M eljon•. Review bid oage 21 , <br /> Orders 835.120 under which a change order Is allowed and document for paragraph 21 , <br /> include in bid document. May use Section ln&mlon of the and page 22, <br /> 7.3.11 of MOT CPAM as part of procedure, provision, paragraph 22. <br /> 6. Claims 23 CFR Yes Yes No No Develop procadurea outlining the conditions Review bid Page 23, <br /> 636. 124 under which a claim is allowed and Include In document for paragraph 25 <br /> bid document. May use Section 7.5 of FDOT Inclusion of the ✓ <br /> CPAM as part of procedure. provision_ <br /> 7. Contractor 23 CFR 140 Yes Yes Yes You Do not allow. Review bid Page 249 AW <br /> 49 CFR document to Paragraph 28 <br /> Equipment for Part 18 ensure exclusion <br /> State or Local 49 CFR of provision. <br /> Ownership Section <br /> 18.3 <br /> 8. Suspension 49 CFR 29 Yes Yes Yes Yes The Local Agency shall Include certification Review bid Pape 18, „r <br /> and Debarment in bid documents, document for Paragraph 15, <br /> inclusion of Page 24, <br /> provision. paragraph 27 <br /> and Page P-18. <br />