My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-101
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2016 9:28:09 AM
Creation date
10/1/2015 3:28:10 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/14/2009
Control Number
2009-101
Agenda Item Number
8.D.
Entity Name
Florida Department of Transportation
Subject
Indian River Blvd. Sidewalk Improvements
Resolution 2009-040
Area
12th St. to 17th St.
Supplemental fields
SmeadsoftID
10572
Document Relationships
2009-040
(Attachment)
Path:
\Resolutions\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
62&4,444 <br /> PROJECT MANAcer.arrr <br /> P.y. 7 or e <br /> NHS! Nonw Non- Nomp Referonce <br /> SHS NHSI NHS! Federal- Construction <br /> SHS Non- Aid Agency Responsibility Monitoring Contract Local FDOT <br /> Requirement Rahronce Local y po ity g Agency District <br /> 5H3 Highway! <br /> Non-SH3 ResponsiblafNs (Location in Initial Initial <br /> 13 Contracti <br /> 33. State/ 23 CFR Yea No No No If utflized , must obtain FHWA approval. Review bid Page 24, <br /> Local Owned/ 635.407 document for Paragraph 29 <br /> Fumishedl exclusion of Section 2 <br /> Designated materials <br /> Materials fumished by Local <br /> Agency <br /> 34, 23 CFR Yes Yes No No Develop contract language to meet the Review bid Page 24, <br /> Subcontracting 635.116 requirements. document for Paragraph 31 <br /> inclusion of the <br /> provision. <br /> 35. 23 CFR Yes Yes No No Develop contract language for tarrnUratlon for Review bid Page 44, <br /> Termination of 635. 125 cause, convenience, and default and include document for Paragraph 50 <br /> Contract in the bid document inclusion of the and 51 of <br /> provision. General ✓ is <br /> Concttions <br /> 36. Time 23 CFR Yes Yes No No Include reasons lime extensions are showed Review bid Page 23, <br /> Extensions 635.121 In specifications. May use Section 8=7.32 of document for Paragraph 23 <br /> the FOOT Standard Specifications, inclusion of the <br /> 37, Report American Yes Yes Yes Yes Include the American Recovery and Review bid <br /> Jobs Recovery Reinvestment Act of 2009 special provision document for <br /> and SP0070111E8. Inclusion of the <br /> Reimrestrne special provislon. � a4G.t_ <br /> nt Act of <br /> 2009 <br /> IVO r !4 STotm" "es 41PICA715r . <br />
The URL can be used to link to this page
Your browser does not support the video tag.