Laserfiche WebLink
r <br /> EXHIBIT `A' <br /> Scope of Services <br /> The scope of SR-60 consists of milling and resurfacing from west of 1-95 to west of 90th Avenue <br /> and reconstruction from west of 90th Avenue to west of 82"d Avenue . The typical section for <br /> milling and resurfacing consist of a raised median with curb and gutter at the inside edge of <br /> pavements and flush shoulders at the outside edge . The proposed reconstruction typical section <br /> is from 4 to 6 lanes consisting of a raised 22' median with curb and gutter at the inside edge of <br /> pavements and curb and gutter with sidewalk at the outside edge of pavements . Designated and <br /> undesignated bike lanes will also be provided . The lighting , signing , pavement markings , and one <br /> ( 1 ) signalized intersection will be upgraded for the corridor. This project also includes the <br /> replacement of a portion of an open canal (R-3 Canal) located along the south side of the corridor <br /> with an underground pipe . <br /> Also included in the scope is providing Construction Engineering Inspection (CEI ) Services forthe <br /> Project. <br />