My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-323A
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-323A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 1:36:04 PM
Creation date
10/1/2015 12:58:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
12/15/2009
Control Number
2009-323A
Agenda Item Number
8.D.
Entity Name
Florida Inland Navigation District
Subject
Dredged Material Exhibit B
Supplemental fields
SmeadsoftID
7963
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. 3. 4 Weir-Mounted Stage Gauge <br /> Finally, to improve the contractor 's ability to monitor water levels and ponding depths within the <br /> basin, the contractor must install a stage gauge, or staff, constructed of UV-resistant PVC or fiberglass, to <br /> the front face of the weirs . Clearly marked in feet and tenths (as for a surveyor' s stadia rod) and leveled to <br /> NGVD, this gauge will provide a means for the contractor (as well as inspectors, site operators, or other <br /> personnel authorized to enter the IR- 14 facility) to directly read the water level within the basin from any <br /> position around the basin ' s perimeter. <br /> 3 .0 WEIR OPERATIONAL GUIDELINES <br /> 3 . 1 Introduction <br /> This section presents guidelines for operating the discharge weirs at FIND Site IR44 during all <br /> phases of operations for which the selected dredging contractor will be responsible as part of his <br /> contracted services. These guidelines are intended to supplement the guidelines contained in the site 's <br /> Management Plan (Taylor et al . , April 1992). In those cases where the guidelines presented here conflict <br /> with the guidelines presented in the Management Plan, the present guidelines supersede the guidelines <br /> contained in the earlier plan document. <br /> The remaining sections of this chapter are organized as follows . Section 3 .2 outlines requirements <br /> for installing the required shut-off valve on the weir outflow pipe and modifying the existing weir system <br /> consistent with the preliminary design modifications presented in Chapter 2 .0. Section 3 . 3 presents <br /> guidelines for setting the initial weir elevation before the start of dredging operations and for operating <br /> the weir system during dredging operations as required to control water level and ponding depths within <br /> the basin and to maintain effluent quality consistent with permit requirements. Section 3 . 3 also presents <br /> dike inspection requirements that may be triggered by excessive ponding depths within the basin. Section <br /> 3 . 4 presents guidelines for operating the weir system through the completion of decanting procedures, for <br /> securing the weir system to prevent unauthorized discharges following the completion of decanting, and <br /> for demobilizing from the site at the completion of contracted services. <br /> - 12 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.