My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-283B
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-283B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2016 2:08:23 PM
Creation date
10/1/2015 1:19:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Lease
Approved Date
11/03/2009
Control Number
2009-283B
Agenda Item Number
8.Q.
Entity Name
Florida Inland Navigation District
Subject
Lease Agreement
Supplemental fields
SmeadsoftID
8586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Once the basin produces effluent that meets the required turbidity standards , the contractor should <br /> then maintain the necessary ponding depth by increasing the weir crest elevation at about the same rate as <br /> sediment builds within the basin . The contractor should install additional weir boards at the point the <br /> depth of flow over the weir crest approaches the width of the boards to be added . <br /> As the basin nears its design capacity, the contractor must reduce his operational ponding depth to <br /> ensure that the elevation of the ponded water remains a minimum of 2 ft below the elevation of the dike <br /> crest, the minimum allowable freeboard for the IR- 14 containment facility. Continuing to meet effluent <br /> standards may require that the contractor reduce the dredge output or operate the dredge intermittently to <br /> provide the required retention time . During periods when the dredge remains idle, the contractor may also <br /> find it necessary to grade and distribute the mounds of coarser material deposited nearer the dredge <br /> discharge outlet to increase the plan area of the ponded water and thereby improve the basin ' s retention <br /> performance and effluent quality. Under no circumstances shall the contractor allow the dredged material <br /> to mound above the elevation of the dike crest . <br /> 3 . 4 Weir Operations During Decanting <br /> Following the completion of dredging operations , the contractor must continue to operate the weir <br /> system and slowly release the clarified surface water that remains ponded within the basin over the weir <br /> crest by incrementally removing weir boards . The process , known as decanting, continues until all <br /> residual ponded water within the basin at the completion of dredging is released over the weirs . To <br /> maintain effluent quality throughout the decanting process, the contractor should allow the flow over the <br /> weirs to drop essentially to zero before removing another set of weir boards . The contractor may be <br /> required to grade the deposited dredged material to drain isolated pockets of water so that this water may <br /> also be released over the weirs. If at any time during the decanting process monitoring shows effluent <br /> turbidity to exceed permitted standards, the contractor must again add weir boards until testing of the <br /> ponded water that remains within the basin confirms that turbidity has returned to acceptable limits . <br /> While decanting proceeds , the contractor may begin to dismantle and remove the dredge pipeline. <br /> Working from the site back toward the ICWW, the contractor must plan the operation to ensure that all <br /> residual water contained within the pipeline drains to the ICWW . <br /> 17 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.