Laserfiche WebLink
5 .0 ESTABLISHMENT AND MAINTENANCE OF VEGETATIVE COVER <br /> Following construction of the contairunent facility , and again following each use of the facility to <br /> receive and dewater dredged material, the FIND will remain responsible for establishing and maintaining <br /> a vegetative cover on all exposed surfaces of the dike . To prevent the establishment of shrubs, trees , or <br /> other woody vegetation, the dike ' s slopes and crest will be regularly mowed, and maintained sufficiently <br /> short to allow visual inspection of the soil surfaces in critical areas such as <br /> 1 ) The condition of vegetation on the dike and in areas for 50 ft downstream from the <br /> outside toe; <br /> 2) The condition of soil surfaces on the top and slopes of the dike and in areas for 50 ft <br /> downstream from the outside toe; <br /> 3) The condition of drainage ditches in the area of the base of the dike; <br /> 4) The liquid surface elevation and amount of freeboard; and <br /> 5 ) The condition of spillways and water level control structures , including all conduits <br /> exiting the dikes . <br /> . 21 - <br />