<br /> 7. Before FPL can begin its engineering work on the underground electric distribution facilities, the Customer shall provide FPL with the
<br /> following :
<br /> a) Paving , grading , and drainage plans showing all surface and sub-surface drainage satisfactory to FPL,
<br /> b) A construction schedule,
<br /> c) An estimate of when electric service will be required , and Copies of the customer's final construction plans as
<br /> well as other construction
<br /> drawings (plot, site, sewage, electrical , etc. ) requested by FPL plats provided by the customer must be either recorded by thre
<br /> circuit clerk or
<br /> other recording officer or prepared and certified as meeting the requirements for recording (except approval by the
<br /> governing body) by a
<br /> registered land surveyor
<br /> d) Copies of the Customers final construction plans as well as other construction drawings (plot, site, sewage , electrical , etc.
<br />) requested by FPL
<br /> provided by the customer must be either recorded by the circuit clerk or other recording officer or prepared and certified
<br /> as meeting the
<br /> requirements for recording (except approval by the governing body) by a registered land surveyor.
<br /> 8. Prior to FPL construction pursuant to this agreement, the Customer shall :
<br /> a) Clear the FPL easement on the Customer's property of tree stumps, all trees , and other obstructions that conflict with construction ,
<br /> including the
<br /> drainage of all flooded areas. The Customer shall be responsible for clearing , compacting , boulder and large rock removal
<br />, stump removal ,
<br /> paving and addressing other special conditions. The easement shall be graded to within six inches of final grade with soil stabilized.
<br /> b) Provide property line and corner stakes, designated by a licensed surveyor, to establish a reference for locating the underground
<br /> cable trench
<br /> route in the easement and additional reference points when required by FPL. Also, the Customer shall provide stakes identifying
<br /> the location ,
<br /> depth , size and type facility of all non-FPL underground facilities within or near the easement where FPL distribution facilities
<br /> will be installed .
<br /> The Customer shall maintain these stakes , and if any of these stakes are lost, destroyed or moved and FPL requires their use,
<br /> the Customer
<br /> shall replace the stakes at no cost to FPL, unless the stakes are lost, destroyed or moved by an agent, employee, contractor or subcontractor
<br /> of
<br /> FPL, in which case FPL will pay the Customer the cost of replacing the stakes.
<br /> c) It is further understood and agreed that subsequent relocation or repair of the FPL system , once installed , will be paid by
<br /> the Customer if said
<br /> relocation or repair is a result of a change in the grading by the Customer or any of the Customer's contractors or subcontractors
<br />from the time
<br /> the underground facilities were installed ; and , that subsequent repair to FPL's system , once installed , will be paid by the Customer if
<br /> said repair is
<br /> a result of damage caused by the Customer or any of the Customer's contractors or subcontractors .
<br /> d) Provide sufficient and timely advance notice ( days) as required by FPL, for FPL to install its underground distribution
<br /> facilities prior to the
<br /> installation of paving , landscaping, sodding, sprinkler systems, or other surface obstructions. In the absence of sufficient
<br />coordination , as
<br /> determined by FPL, by the Customer, all additional costs for trenching and backfilling shall be paid by the Customer, and none
<br />of the costs of
<br /> restoring paving , landscaping , grass , sprinkler systems and all other surface obstructions to their original condition , should they be
<br /> installed prior
<br /> to FPL's facilities , shall be borne by FPL.
<br /> e) Pay for all additional costs incurred by FPL which may include, but are not limited to, engineering design , administration and relocation
<br /> expenses,
<br /> due to changes made subsequent to this agreement on the subdivision or development layout or grade .
<br /> f) Provide applicable trenching , backfilling and installation of Company provided conduit in accordance with FPL specifications.
<br /> 9. FPL shall :
<br /> a ) Provide the Customer with a plan showing the location of all FPL underground facilities , point of delivery, and
<br /> transformer locations and
<br /> specifications required by FPL and to be adhered to by the Customer.
<br /> b) Install , own , and maintain the electric distribution facilities up to the designated point of delivery except when otherwise noted .
<br /> c) Request the Customer to participate in a pre-construction conference with the Customer's contractors , the FPL representatives and other utilities
<br /> within six (6) weeks of the start of construction . At the pre-construction conference , FPL shall provide the Customer with an estimate
<br /> of the date
<br /> when service may be provided .
<br /> 10. This Agreement is subject to FPL's Electric Tariff, including but not limited to the General Rules and Regulations for Electric Service
<br /> and the Rules of
<br /> the Florida Public Service Commission , as they are now written , or as they may be revised , amended or supplemented .
<br /> The Customer and FPL will coordinate closely in fulfilling obligations in order to avoid delays in providing permanent electric
<br /> service at the time of the
<br /> Customer's receipt of a certificate of occupancy.
<br /> Accepted : Ac ed :
<br /> - 22 - 03
<br /> For FPL (Date) sto er (Date)
<br /> V6AIMIJ �9GA�U 7Date) 3
<br /> (PrintName) Witness (Date)
<br /> 7 - 22 - 03
<br /> Witness (Date)
<br /> AP ROVED :
<br /> CiAiNim)
<br /> t UF
<br /> BY
<br /> FE
<br /> ASNTY ATTORNEY
<br />
|