Laserfiche WebLink
payment bond pursuant to Section 255.05, Florida Statutes, shall extend thirty (30) days beyond the Final <br />Acceptance Date. <br />ARTICLE 5 - WARRANTY <br />5.1 General Warranty. The Company warrants to the Customer that the Services performed by the <br />Company under this Master Agreement shall be performed with the degree of skill and care that is required by <br />current good and sound professional procedures and practices, and in conformance with generally accepted industry <br />standards prevailing at the time the Services are performed. The Company further warrants that all equipment and <br />materials provided and installed by the Company in connection with the implementation of any ECO hereunder shall <br />be new, be free from significant defects in design, engineering, materials, construction and workmanship, as <br />reasonably determined by the Customer, and conform in all material respects with all requirements of applicable <br />law, the final Design Documents applicable to such ECO and all descriptions set forth therein, applicable <br />engineering and construction codes and standards, and all other requirements of this Master Agreement and of any <br />applicable Customer -authorized Implementation Services Authorization Form. <br />5.2 Warranty Period. The warranty period for the warranties set forth in Section 5.1 shall extend, with <br />respect to each installed ECO, for a period of one (1) year commencing thirty (30) days following the Substantial <br />Completion Date for such ECO. <br />5.3 Remedies. The Customer shall promptly notify the Company in writing of the discovery during <br />the applicable warranty period of any claim against the Company's warranties under Section 5. 1, including any <br />defects in the equipment or materials installed as part of an ECO. As the Customer's sole and exclusive remedy for <br />any such claim against the Company's warranties, the Company shall, at its own cost and expense, as soon as <br />reasonably possible following the Company's receipt of notice of any claim against any warranty or the Company's <br />otherwise obtaining knowledge of any claim of warranty, cause the repair (or as Company determines appropriate <br />the replacement, rework and/or retest) of defective equipment and construction workmanship and/or provide at the <br />Company's expense any changes, modifications or additions to the work which the Company determines necessary <br />due to a failure to perform any Services hereunder and furnish the equipment and materials in accordance with the <br />standards set forth in Section 5.1. All costs directly associated with the Company's rework and testing thereof shall <br />be borne by the Company. The Company shall use reasonable efforts to perform such remedial actions and make <br />any tests in a timely manner and at such times so as to minimize disruption of normal operations at the Customer's <br />Service Location. <br />5.4 Vendor Warranties. Without limiting the Company's warranty set forth in Section 5.1, the <br />Company, in procuring materials and equipment for an ECO, shall use reasonable efforts to obtain customary and <br />standard Vendor warranties from the supplier or Subcontractor for the benefit of the Company and the Customer. <br />The Customer shall be entitled to the benefit of any Vendor or Subcontractor warranties obtained which are better or <br />of longer duration than those provided by the Company hereunder. If any such warranties are for a period longer <br />than the Company's warranties, they shall be transferred to the Customer at the end of the Company's warranty <br />period under Section 5.3. <br />5.5 Company Principally Responsible. Notwithstanding Section 5.4, the Company shall have primary <br />liability with respect to all Company warranties set forth in Section 5.1, including warranties with respect to <br />materials and equipment, whether or not any event or defect is also covered by a Vendor or Subcontractor warranty, <br />for the warranty period set forth in Section 5.3, and the Customer need only look to the Company for corrective <br />action during the warranty period set forth in Section 5.3. Upon the expiration of the warranty period set forth in <br />Section 5.3, Customer shall look to the applicable Vendor or Subcontractor to the extent such Vendor or <br />Subcontractor provides a warranty beyond the warranty period in Section 5.3. <br />5.6 Warranty Exclusions. The liabilities and obligations of the Company under this Article 5 do not <br />extend to any repairs, adjustments, alterations, replacements or maintenance which were not prior approved in <br />writing by the Company or may be required as a result of wear and tear in the operation or use of an ECO, or as a <br />result of the Customer's failure to operate or maintain an ECO in accordance with the operating manuals or <br />instructions supplied by the Company, or in accordance with the training provided by the Company to Customer's <br />Page 9 of 20 Rev 08/15/08 <br />