My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-183
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 9:55:32 AM
Creation date
10/1/2015 3:40:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
06/23/2009
Control Number
2009-183
Agenda Item Number
8.H.
Entity Name
FPL Energy Services Inc.
Subject
Change Order No.1 Phase 1 HVAC Improvements
Revised Energy Savings Guarantee
Area
North County Library
Supplemental fields
SmeadsoftID
10718
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 4 <br /> Measure Specific Lighting Savings <br /> Per Option A , Pre measurements with annual post spot measurements will be taken to establish energy <br /> consumption , for a representative sample of the lights , and pre measurement at full load , with annual post spot <br /> measurements for the lighting . These measurements will be accomplished through the use of hand held <br /> meters and/or mounting of temporary meters ( by FPL ENERGY SERVICES , INC ) . The results will be used to <br /> prorate the calculated savings , thus determining the adjustment ( +/- ) , to be used in the comparison with <br /> the <br /> Guaranteed Savings . <br /> Equations for Calculating Lighting Energy and Demand Savings <br /> To determine estimates of energy savings for lighting efficiency projects use the following equation : <br /> kWh Savingst = ( (kW/Fixturebaserne x Quantitybase,;,,e - kW/Fixturepost x Quantitypo J x Hours of <br /> Operation]r, ,, <br /> where : <br /> KWh Savings = kilowatt- hour savings realized during the post- installation time <br /> period t <br /> KW/fixturebasetine = lighting baseline demand per fixture for usage group u <br /> kW/fixturepost = lighting demand per fixture during post- installation period for <br /> usage group u <br /> Quantitybaserine = quantity of affected fixtures before the lighting retrofit for usage <br /> group u , adjusted for inoperative and nonoperative lighting fixtures <br /> Quantitypost = quantity of affected fixtures after the lighting retrofit for usage <br /> group u <br /> Hours of Operation = number of operating hours during the time period t for the usage <br /> group u , assuming operating hours are the same before and after <br /> measure installation <br /> Demand <br /> Demand savings can be calculated as either an average reduction in demand or as a maximum reduction in <br /> demand <br /> Average reduction in demand is generally easier to calculate . It is defined as kWh savings during the <br /> time <br /> period in question ( e . g . utility summer peak period ) divided by the hours in the time period . <br /> Maximum demand reduction with respect to cost savings , is typically the reduction in utility meter maximum <br /> demand under the terms and conditions specified by the servicing utility . For peak load reduction , for example , <br /> the maximum demand reduction may be defined as the maximum kW reduction averaged over 30-minute <br /> intervals during the utility' s summer peak period . The maximum demand reduction is usually calculated <br /> to <br /> determine savings in utility peak demand charges . <br /> Annual Reconciliation <br /> Indian River County , Florida 12 Indian River County Phase 1 <br /> Phase I Rev . 06/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.