My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-011
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 11:41:07 AM
Creation date
9/30/2015 6:15:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
01/14/2003
Control Number
2003-011
Agenda Item Number
11.H.1.
Entity Name
George E. French
Subject
Paving and Drainage Improvements - Work Authorization
Area
63rd Ave from 4th St to 8th St
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
2796
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br /> � No. 2001-036 <br /> 03-0// <br /> 63rd AVENUE FROM 4TH STREET TO 8T" STREET WATER MAIN RELOCATION PROJECT <br /> DATE OF ISSUANCE: December 11, 2002 EFFECTIVE DATE January 15, 2003 <br /> OWNER: Indian River County <br /> CONTRACTOR: George E French <br /> CONTRACT:WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT/EXTENSIONS <br /> AND MISCELLANEOUS LABOR CONTRACT UCP#909 BID NO. 3032 <br /> PROJECT: 63`d AVENUE FROM 4TH STREET to 8`h STREET WATER MAIN ADJUSTMENT <br /> COUNTY UTILITY PROJECT NO.: UCP#2244 CONTRACTOR'S PROJECT NO.:N/A <br /> COUNTY W.I.P.No. 471-169000-02532 <br /> You are directed to proceed promptly with the following work: <br /> Description: <br /> Replace 8"above ground canal crossing at 8h Street with 8"HDPE subaqueous crossing, relocate five fire <br /> hydrants, relocate five water services/meters, lower water main to avoid conflict with proposed 18"RCP <br /> culvert, raise all valve boxes. <br /> Purpose of Work Authorization Directive: <br /> The construction will eliminate conflicts with paving and drainage improvements proposed by the Road& <br /> Bridge Division. <br /> Attachments: (List documents supporting work) <br /> Attachment A Exhibit showing location of work <br /> Method of determining Contract Price: <br /> !] Unit Prices: Bid Items as established pursuant to Bid No. 3032,and awarded by the Board of County <br /> Commissioners on January 7, 2001 to George E. French <br /> ❑ Lump Sum <br /> ❑ Cost of the Work <br /> The Cost of Labor, Contingency and Contract Time is summarized below: <br /> Estimated Labor Cost= $24,707.45 Estimated Contract Time: 30 days <br /> Contingency at 10%= $ 2,470.75 <br /> Total Estimated Labor Costs= $27,178.20 <br /> ACC TED: RE MNWNDT6 f r ROVED*. <br /> B !'' By: <br /> CO RACTOR ENGINE DIRECTOR <br /> Date: /02 -/8= z� Date: /2'- -<` ' 'C' Date: <br /> APPROVED: APP VE <br /> Br- <br /> Indian R er Co. Approved Date By. <br /> ASSIST. DIRECTOR CO WTY, CHALRMAN <br /> ,ldministrstition Date: Date: 01-14-2003 <br /> l`tilitic � � <br /> ilu d k e t -ties\ N INEERING\Projects-Utility Constriction Permits\IRC-63rd Ave.from 4th St.to 8th St.Water Main <br /> — Adjustments\Work Authorization No.2001-036.doc9 <br /> LeRui <br /> 15l� �11ai1til tsr Attachment 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.