My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-200B
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-200B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 1:37:01 PM
Creation date
9/30/2015 7:56:23 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bond
Approved Date
08/24/2004
Control Number
2004-200B
Agenda Item Number
7.G.
Entity Name
French George Underground Utilities, Inc.
Subject
Performance Bond
US 1 Water Main
Area
Grove Isle Estates
Archived Roll/Disk#
3223
Supplemental fields
SmeadsoftID
4246
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1573919 RECORDED IN THE RECORDS OF JEFFREY K BARTON , CLERK CIRCUIT COURT INDIAN <br /> RIVER CO FL , BK : 1778 PG : 777 , 08 / 31 / 2004 10 : 54 AM <br /> * * * * Bond # OCN545279 <br /> * * PERFORMANCE BOND <br /> * * The American Institute of Architects, <br /> * * AIA Document No . A312 (December, 1984 Edition) <br /> * * * Any singular reference to Contractor, Surety , Owner or other <br /> party shell be considered plural where applicable . <br /> CONTRACTOR (Name and Address) : OWNER (Name and Address): <br /> Underground Utilities, Inc. Indian River County Board of County Commission <br /> 390 - 21st Street, S.E. 2625 - 19th Avenue <br /> Vero Beach, FL 32%2 Vero Beach, FL 32960 <br /> CONSTRUCTION CONTRACT SURETY (Name and Principal Place of Business): <br /> Old Republic Surety Company <br /> Date: P.O. Box 4668 <br /> Amount $ 167,500.00 Winter Padc, FL 327934668 <br /> Description (Name and Location): IRC Bid # 6088; Water Main Project along U.S. Highway #1 from Garden Grove to Grove <br /> Isle Estates. <br /> Bond # OCN545279 <br /> Date (Not earlier than Construction Contract Date): August 26, 2004 <br /> Amount. 5209,375.00 <br /> Modifications to this Bond : ® None ❑ See Page 2 <br /> CONTRACTOR AS PRINCIPAL SURETY <br /> CompaltX ' t �� i ' : , ' •_'' (Corporate Seal) Company : <br /> ( Orporpts'8eel) <br /> UOld Republic Surety Company , - <br /> . A pi G <br /> Slgrvp/iA : ; 'u Signature: <br /> Name and h Prpcii&Rt Name and Ty1f James E. Didm2eyer, 0•1 <br /> (Any additionIalpn>♦ty'r1q. Baer on page 2.) �- <br /> (FOR INFORMATION Only- Name, Address end Telaphone) OWNER'S REPRESENTATIVE (Architect, Engineer or either <br /> AGENT or BROKER : The Didcmeyar Agency party): <br /> 607 SL Lucie Crescent, Stuart, FL 34994 <br /> 1 The Contractor and the Surety, jointly and severally, bind them- 3.3 The Owner has agreed to pay the Balance of the Contract Price <br /> selves, their heirs, executors, administrators, successors and assigns to the Surety In accordance with the terms of the Construction <br /> to the Owner for the performance of the Construction Contract, which Contract or to a contractor selected to perform the Construction <br /> Is incorporated herein by reference. Contract in accordance with the terms of the contract with the <br /> 2 If the Contractor performs the Construction Contract, the Surety and Owner. <br /> the Contractor shall have no obligation underthle Bond, except to par- 4 When the Owner has satisfied the oondltions of Paragraph 3, the <br /> ticipete In conferences as provided in Subparagraph 3. 1 . Surety shall promptly and at the Surety's expense take one of the <br /> 3Ifthere Is no Owner Default/ the Surety's obligation under this Bond following actions: <br /> shall arise after: <br /> 3. 1 The Owner has notified the Contractor and the Surety at Its 4. 1 Arrange for the Contractor with consent of the Owner, to <br /> address described in Paragraph 10 below that the Owner Is con- perform and complete the Construction Contract; or <br /> sidering declaring a Contractor Default and has requested and <br /> attempted to arrange a conference with the Contractor and the 4.2 <br /> through to o.T Undertake tperform and complete <br /> or through Independent contractors; ct <br /> ts the Construction Contra <br /> Surety to be held not later than firteen days after receipt of such <br /> or <br /> notice to discuss methods of performing the Construction Contract. 4.3 Obtain bids or negotiated proposals from qualified contractors <br /> If the Owner, the Contractor and the Surety agree, the Contractor acceptable to the Owner for a contract for performance and com- <br /> shall be allowed a reasonable time to perform the Construction Con- pletion of the Construction Contract, arrange for a contract to be <br /> tract, but such an agreement shall notweive the Owner's right, if prepared for execution by the Owner and the contractor Wanted <br /> any, subsequently to declare a Contractor Default; and with the Owner's concurrence, to be secured with performance <br /> 3.2 The Owner has declared a Contractor Default and formally and payment bonds executed by a qualified surety equivalent to <br /> terminated the Contractors right to complete the contract Such the bonds Issued on the Construction Contract, and pay to the <br /> Contractor Default shall not be declared earlier than twenty days Owner the amount of damages as described in Paragraph 6 In <br /> after the Contractor and Surety have received notice as provided excess of the Balance of the Contract Price incurred by the Owner <br /> In Subparagraph 3. 1 ; and resuming from the Contractors default; or <br /> ORSC 22110 (10-93) Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.