Laserfiche WebLink
Indian River County Department of Utilities <br /> COST <br /> Project: IRC - 38th Lane East of US 1 Water Conflict with Storm Sewer Construction ESTIMATE <br /> UCP #2285 <br /> 4-Mar-03 <br /> Bid Item <br /> Estimated Unit of Unit Total Labor <br /> Item No Desert tion Material Unit <br /> t Measure Material Total <br /> uantiPrice Price <br /> Price Price Price <br /> 63 Mobilization 1 <br /> 64 Demobilization 0.05 194.75 <br /> 1 0.03 <br /> 65 Maintenance ofTraffic 116.85 <br /> 1 <br /> 0.05 194.75 <br /> la Install 3" PVC Water Main 60 LF <br /> Ila Install 1 " Water Service Line 6.00 360.00 0.50 30.00 <br /> 50 LF 10.00 500.00 <br /> OSa Furnish & Install DIP Fittin s 0 25 0.26 13.00 <br /> 19 Remove & Replace Meter Box and Tie into Meter 4 TONS 19500.00 375.00 5,500.00 <br /> 1 ,375.00 <br /> 20 Potholes EA 125.00 500.00 <br /> 4.00 ( 00.00 400.00 <br /> 38 ROW Gradin Y EA 100.00 400.00 <br /> 6 <br /> 40.00 SY 6.00 240.00 <br /> Make Connection to Existin Main 4.00 <br /> EA 380.00 1 ,520.00 <br /> Subtotal Water Facilities <br /> 3,895.00 <br /> Total Water Facilities <br /> Total Materials 4,401 .35 <br /> IRCDUS Force Account 1 1 ,818.00 <br /> Total Labor <br /> 4,841 .49 <br /> TOTAL ESTIMATED COST <br /> 6,659.49 <br /> CmITXWs Bid II List <br />