Laserfiche WebLink
L R " t ' 021 <br /> 1G�� R <br /> �R <br /> �7 , z4e _ <br /> SECTION 00530 - EJCDC 0 7 ` ® 0 <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT dated the 24th day of August in the year 2004 by and <br /> between Indian River County, a political subdivision of the State of Florida (hereinafter called <br /> OWNER) and (hereinafter called CONTRACTOR) . <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows : <br /> ARTICLE 1 . WORK <br /> CONTRACTOR shall complete all work as specified or indicated in the Contract Documents . The <br /> work is generally described as follows : <br /> The project anticipates the construction of approximately 2700 LF of 12 " <br /> PVC water main , 6 Fire Hydrant Assemblies , 7 valves and 150 LF of 12 " <br /> Directional Drill water main . Construction consists of, but is not limited to , <br /> utilities exploration , coordination with any permitting agencies , trenching , <br /> dewatering , installation of pipe with fittings and all appurtenances , <br /> restrainers , soil compaction , disinfection , testing ( includes providing <br /> temporary jumper or another approved method for disinfection and <br /> flushing ) , irrigation repair, private or public property replacement or repair, <br /> franchise utility repair, ROW restoration and traffic control . PVC pipe shall <br /> be C-900 per Indian River County Utility Standards and Specifications and <br /> FDOT Standards . <br /> CONTRACTOR , as an independent contractor and not as an employee , shall furnish , for the sum <br /> amount of $_167 , OS 0 " 00_, all of the necessary labor, material , and equipment to perform the work <br /> described above in accordance with the Contract Documents . <br /> ARTICLE 2 . ENGINEER <br /> The project has been designed by Indian River County Utilities Department, hereinafter called <br /> ENGINEER, and who is to act as OWNER' S representative , assume all duties and responsibilities <br /> and have the rights and authority assigned to ENGINEER in the Contract Documents in <br /> connection with completion of the work in accordance with the Contract Documents . <br /> 00530- 1 <br /> F :\Utilities\UTILITY - ENGINEERING\Projects - Utility Construction Permits\IRC - US 1 Water Main from Grove Isle Estates to <br /> Garden Grove UCP #2395\13ID DOCUMENTS\BID DOCUMENTS\00530 EJCDC - REVISED (per Marion ) Agreement between <br /> Owner and Contractor.doc <br />