My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-200
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 1:25:01 PM
Creation date
9/30/2015 7:56:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/24/2004
Control Number
2004-200
Agenda Item Number
7.G.
Entity Name
George French
Subject
US 1 Water Main from Grove Isle Estates to Garden Grove
Area
Garden Grove
Archived Roll/Disk#
3223
Supplemental fields
SmeadsoftID
4245
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 . 2 Final payment. Upon final completion and acceptance of the work in accordance <br /> with Paragraph 14 . 13 of the General Conditions , OWNER shall pay the remainder <br /> of the Contract Price as recommended by ENGINEER as provided in said <br /> Paragraph 14 . 13 . <br /> ARTICLE 6 . INTEREST. <br /> Not Applicable . <br /> ARTICLE 7 . CONTRACTOR'S REPRESENTATIONS . <br /> In order to induce OWNER to enter into this Agreement , CONTRACTOR makes the following <br /> representations : <br /> 7 . 1 CONTRACTOR has familiarized itself with the nature and extent of the Contract <br /> Documents , work , site , locality , and all local conditions and laws and regulations <br /> that in any manner may affect cost, progress , performance or furnishing of the <br /> work . <br /> 7 . 2 CONTRACTOR has studied carefully all reports of explorations and tests of <br /> subsurface conditions and drawings of physical conditions which are identified in <br /> the Supplementary Conditions as provided in Paragraph 4 . 2 of the General <br /> Conditions , and accepts the determination set forth in Paragraph SC-4 . 2 of the <br /> Supplementary Conditions of the extent of the technical data contained in such <br /> reports and drawings upon which CONTRACTOR is entitled to rely. <br /> 7 . 3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br /> obtaining and carefully studying ) all such examinations , investigations , <br /> explorations , tests , reports and studies (in addition to or to supplement those <br /> referred to in Paragraph 7 . 2 above ) which pertain to the subsurface or physical <br /> conditions at or contiguous to the site or otherwise may affect the cost, progress , <br /> performance or furnishing of the work as CONTRACTOR considers necessary for <br /> the performance of furnishing of the work at the Contract Price , within the Contract <br /> Time and in accordance with the other terms and conditions of the Contract <br /> Documents , including specifically the provisions of Paragraph 4 . 2 of the General <br /> Conditions ; and no additional examinations , investigations , explorations , tests , <br /> reports , studies or similar information or data are or will be required by <br /> CONTRACTOR for such purposes . <br /> 7 .4 CONTRACTOR has reviewed and checked all information and data shown or <br /> indicated on the Contract Documents with respect to existing underground facilities <br /> at or contiguous to the site and assumes responsibility for the accurate location of <br /> said underground facilities . No additional examinations , investigations , <br /> explorations , tests , reports , studies or similar information or data in respect of said <br /> 00530-4 <br /> F :\Utilities\UTILITY - ENGINEERING\Projects - Utility Construction Permits\IRC - US 1 Water Main from Grove Isle Estates to <br /> Garden Grove UCP #2395\BID DOCUMENTS\BID DOCUMENTS\00530 EJCDC - REVISED (per Marion ) Agreement between <br /> Owner and Contractor.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.