Laserfiche WebLink
Indian River County Department of Utilities <br /> Contract UCP #909 , BID NO . 3032 <br /> Labor Contractor's Invoice PAY REQUEST # 1 100% Complete <br /> Project: 63rd Avenue From 4th Street to 8th Street Water Main Aiustment <br /> Descriptio r Proiect NO . 2244 W I P NO 471 - 169000-02532 <br /> Date : 17-Feb-03 <br /> Unit of <br /> Bid Item # Bid Item Descri tion Quanti Measure Unit Price Total Price <br /> 63 Mobilization 1 5% <br /> 64 Demobilization 1 3 % $ 1 , 679 . 45 <br /> 65 Maintenance of Traffic 1 5 % $ 11007. 67 <br /> $ 1 , 679 . 45 <br /> 6 Make Connection to Existin Main 24 EA $ 380 . 00 $ 9 , 120. 00 <br /> 09b Install 12"x 8" SS Wet Ta W/GV <br /> 10c Tan 12" Water Main <br /> 10b Ta 6" Water Main 4 EA $ 350. 00 $ 11400 . 00 <br /> 01d Install 8" HDPE Water Main <br /> 40 LF $ 10 . 00 $ 400 . 00 <br /> 01c Install 6" HDPE Water Main 0 LF $ 8 . 00 $ <br /> 01c Install 6" Water Main 208 LF $ 8 . 00 $ 1 , 664 00 <br /> 01d Install 8" PVC Water Main 20 LF $ 10 . 00 $ 200. 00 <br /> 16a Relocate Fire Hydrant Ass W/ GV 4 EA $ 1 , 000. 00 $ 4 , 000 . 00 <br /> 13c Install 6" Gate Valve 0 EA $ 200 . 00 $ <br /> 05a Install DIP Fittin s 2 TON $ 1 , 500. 00 $ 3 , 000 00 <br /> 11a Water Service Line 1 " PE tubin 420 LF $ 10 . 00 $ 41200. 00 <br /> 19 Remove and Replace Meter Box 25 EA $ 125 . 00 $ 31125 . 00 <br /> 20 Potholes 60 EA 's7 100 . 00 $ 61000 <br /> 24 Obtain Bacterial Sam les 0 EA $ 40. 00 $ <br /> 45 Install As halt Cement 0 SY $ 20. 00 $ <br /> 46 Remove and Re lace Rock Base 0 SY $ 10 . 00 $ <br /> 47 Remove and Re lace Sub rade 0 SY $ 6 . 00 $ <br /> 39 Right-of--way Grading 80 SY $ 6 . 00 $ 480. 00 <br /> Subtotal Water System Labor $ 33 , 589. 00 <br /> Subtotal Water System Mobilization, Demob. , MOT $ 41366 . 57 <br /> Total System Labor $ 37,955.57 <br /> Total Completed To Date 100% $ 37,955.57 <br /> Total Retains a 0% $ - <br /> Less Total Paid To Date 0% <br /> Total Invoice Amount Due $ 37,955.57 <br /> FEIN # 65- 1144992 <br /> Contractor's # CUC051660 <br /> Submitted by Contractor <br /> Date - /q - a eorg rench <br /> Approved IRqU Engineer � - - <br /> Date GP o1 3 _ Gordon E. S ark P . E . <br /> - - o .� .� <br /> Indian River Co . Approved <br /> Date <br /> :Administration <br /> I tilities <br /> Budget <br /> Legal 6 <br /> M ; naget. Attachment 2 <br />