My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-095
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 1:23:10 PM
Creation date
9/30/2015 6:28:00 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> Indian River County Department of Utilities <br /> COST ESTIMATE <br /> Project: 341h & 34th Avenues Grovenor Estates Water Services/hIcters Relocations/Replacements <br /> UCP #2293 <br /> 3-Apr-O3 <br /> Bid Item <br /> n Estimated Unit of Unit Total Labor 6laurial Unit 6laterial <br /> Itan No Descri tioTaal <br /> Quantity Measure Price Price Price Price <br /> Price <br /> 63 Mobilization 1 0.05 1 ,527.25 <br /> 64 Demobilization I 0.03 916.35 <br /> 65 Maintenance ofTratTic I 0.05 1 ,527.25 <br /> 06 Make Connection to Existing Main 4 EA 380.00 1 ,520.00 <br /> Ola Install 3 " PVC Water Main 1 ,000 LF 6 .00 6,000.00 <br /> Oic Install 6" PVC Water Main 1 . 14 1 , 140.00 <br /> 20 LF 8.00 160.00 2.74 53.80 <br /> Old Install 6" HDPE Water Main 50 LF 10.00 500.00 <br /> 22a Re lace Exislin • Meter w/ New meter 2.97 148.50 <br /> IOb 45 EA 350.00 50.00 2.750.00 125 .00 6,875 .00 <br /> Ta 6" Walermain 1 ,400.00 <br /> 19 Remove & Replace Meter Box 55 EA 125 .00 6,875.00 100.00 5, 500.00 <br /> 16a Relocate Fire Hydrant Assembly w/6" Gale Valve & Tee 5 EA 1 ,000.00 5,000.00 <br /> 13c Install 6" Gale Valve 1 EA 200.00 200.O0 <br /> Ila Water Service Line 1 " PE Tubing 441 . 22 441 . 22 <br /> 450.00 LF 10.00 4, SOU.UU 0. 15 157. 51) _ <br /> 20 Potholes 10.00 EA 100.00 1 ,000.00 <br /> 24 Obtain Bacterial Sample/Deliver to Lab 4 EA 40.00 160.00 <br /> 39 ROW Gradin • 80 SY 6.00 480.00 <br /> Subtotal Water Facilities <br /> 30,545 .00 <br /> Total Water Facilities <br /> D 34.515.85 <br /> Total Materials <br /> IRCDUS Force Account 14,317.02 <br /> 1 0.20 6,903 . 17 <br /> Total Labor <br /> 41 ,419.02 <br /> TOTAL ESTIMATED COST 55.736.04 <br /> calecln's BM Item list <br />
The URL can be used to link to this page
Your browser does not support the video tag.