My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-155
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2016 9:54:52 AM
Creation date
10/1/2015 12:11:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/20/2008
Control Number
2008-155
Agenda Item Number
8.B.
Entity Name
G.K. Environmental, Inc.
Subject
Change Order 39th Ave. Extension
Area
39th Avenue between 69th & 71st St.
Project Number
0422
Supplemental fields
SmeadsoftID
7028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G . K. ENVIRONMENTAL, INC. <br /> Environmental Consulting <br /> GEORGE R. KULCZYCKI, CEC, CES, CEI <br /> 155 McKee Lane <br /> Vero Beach, FL 32960 <br /> Phone 772-567-9129 <br /> Fax 772-567-6245 <br /> 39tb Avenue Extension / County Proiect #0422 <br /> Details for Task IX / RAI Response to Agency <br /> (February 2007 — March 2008) <br /> 2/26/07 prepare for and meet with Mike 2 . 5 hours $ 275 .00 <br /> Nixon at IRC to review project <br /> 2/30/07 receive & forward ACOE- 0. 5 hour 55 .00 <br /> NPR authorization to IRC <br /> 5/15/07 review planting at mitigation site 2.0 hours 220 . 00 <br /> with B . Powell ; revise plan <br /> 5/20-23/07 revise mitigation, maintenance, 12. 5 hours 1 ,375 .00 <br /> & monitoring plan; provide <br /> copies to all; draft RAI responses <br /> to SJ / RAI; phone review with <br /> IRC staff and SJ review mitigation <br /> with B. Powell re: monument <br /> locations; obtain letter <br /> 6/456,7/07 stake out approximate high-water 10. 5 hours 13155 .00 <br /> marks on wetland vegetation <br /> within mitigation site; prepare <br /> & fax sketch of location; prepare <br /> revised planting plan; deliver <br /> copies to IRC <br /> 7/9/07 meeting with M. Nixon to review 2 .0 hours 220 .00 <br /> project <br /> 7/22-29/07 coordinate & attend onsite meeting 9. 5 hours 19045 .00 <br /> at mitigation site; draft RAI <br /> response; revise mit.,maint. ,&mon. <br /> plan and obtain cost estimates; <br /> review w/ M. Nixon & Andrea S . <br />
The URL can be used to link to this page
Your browser does not support the video tag.