Laserfiche WebLink
Geosyntec Consultants <br /> Table 1 <br /> Summary of Estimated Costs <br /> Indian River County Solid Waste Disposal District <br /> Change Order Request No. 1 for IRC Work Order No. 15 <br /> IRC AST Relocation Project <br /> Propo, al Nu_ .rRUX051 Change Order <br /> Existing Requested Change <br /> Contingency Order Budget <br /> Budget ( Geosyntec requests <br /> ( approved for use by for approval by <br /> Item Item Description IRC on 12/2/20 (18) IRC ) <br /> I Sr . Resource Center Test Pits/NEPA/conference calls $4 , 200 NA <br /> 2 Permitting effort with IRC Community Development Division $967 $ 750 <br /> 3 Subcontractor' s original clectrieal connection scope add-on as requested by IRC $ 10,593 NA <br /> 4 Additional electrical design effort required by IRC Building Division NA $ 1 ,250 <br /> 5 Additional permitting effort required by IRC Building Division NA $ 1 ,450 <br /> Subcontractor's electrical connection scope change order for separate metal conduit required <br /> 6 for communication line NA $2 , 300 <br /> :] <br /> 7 K800 Hybrid card reader upgrade ( approved by IRC on 7/21 /2009) NA $ 1 ,495 . 86 <br /> 8 Vac truck required for AST relocation at Gifford Road NA $6411 <br /> 9 Vac truck required for existing landfill AST (less proposed drum sludge disposal ) NA $ 650 <br /> 10 Repair of Gifford Rd AST components NA $ 1 ' 700 <br /> 11 hour (4) additional bollards ( required by code) NA $ 750 <br /> 12 ASrlq tightness testing (before and after relocation) NA $ 1 '37 (1 <br /> 13 Suy <br /> rveing ( required for Item 15 ) NA $ 540 <br /> Non -scope items for AS' f installation ( required by comments from IRC Building Division <br /> and/or 18 .lune 2009 IRC Fire Division letter) , which include the purchase and installation of <br /> NA $ 6 '4011 <br /> 14 the following : <br /> $ ,2, 920 - Two (2) emergency slop, electrical disconnect shunt t} pe requiring <br /> in o step reset <br /> 52. 160 - Two (2) anti-siphon solenoid valve with manual override <br /> 5305 - 751, o ( ') anion top emergency sheer valves <br /> $ 280 - Two (2) expansion release valves <br /> $ 385 - Tn o (2) leak detector tees <br /> $ 350 - fire exiinguisher and installations <br /> 15 As -built drawing and O& M manual preparation NA $ 1 . 8511 <br /> 16 Painting of AST and <br /> by IRC on 8/27/2009) NA $ 1 , 016 . 50 <br /> 17 Design and oversight effort for additional 10' x 12 ' concrete fueling pads NA $ 7 (111 <br /> 18 Subcontractor' s construction cost for two (2) additional 10' xlT concrete fueling pads NA $ 5 , 136 <br /> 19 Credit to /RC fnr sampling not required fir Gifford Road AST relocate <br /> N - $ 2. 100. 00 <br /> $ 159760 $259898.36 <br /> Total <br /> Note : The currently authorized budget for Work Order No. 15 is $132,474.00 (including $ 15,760 contingency), which was <br /> approved by IRC Board on 05 August 2008. The Change Order request listed above of $25,898.36 would bring the total <br /> budget for this project to a grand total of $ 158,372.36. <br /> 1:I [ 1595 IRC AST Chance Ordcr( FINAL) sls <br /> Page 1 of 1 0' I7t20W) <br />