My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-187
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2016 1:43:48 PM
Creation date
9/30/2015 8:48:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
05/24/2005
Control Number
2005-187
Agenda Item Number
14.B.3
Entity Name
GeoSyntec Consultants
Subject
Proposal Groundwater monitoring; Work Order No.1
Work Authorization No.01
Area
South Gifford Road Landfill
Supplemental fields
SmeadsoftID
4966
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants <br /> LABOR <br /> Task 1 : Project Management/Meetings Task 2.5 : Water Level Measurements <br /> Task 2. 1 : Field Preparation Task 3 : Data Evaluation <br /> Task 2.2 : Well Installation/Development Task 4 : MPIS Reporting <br /> Task 2.3 : Well Redevelopment Task 5 : Plume Monitoring Reporting <br /> Task 2 .4 : Groundwater Sampling Task 6 : Quarterly Remedial System Reports <br /> Task Numbers <br /> Total <br /> Personnel Level Rate 1 2 . 1 2.2 2 .3 2.4 2.5 3 4 5 6 Hrs <br /> Principal $ 185 .00 2 4 6 <br /> Associate $ 160 .00 48 12 4 16 8 2 90 <br /> Sr. Project Prof. $ 141 .68 16 8 2 2 12 2 12 8 48 16 126 <br /> Proj . Prof. $ 108 . 72 12 12 <br /> Professional $ 89 .47 24 24 4 2 12 2 40 160 160 428 <br /> Sr. Staff Prof. $ 81 . 57 12 120 128 260 <br /> Staff Prof. $ 68 .48 16 16 12 318 362 <br /> Field Superintendent $ 82 . 31 <br /> Site Manager $ 81 .20 <br /> Senior Engineering Tech $60 .41 72 12 318 84 486 <br /> Engineering Technician $46 . 85 <br /> Designer $95 . 03 2 120 16 16 16 170 <br /> Senior Drafter $90 . 96 <br /> Drafter $54 . 01 <br /> Administrative Assistant $ 70 .21 24 2 2 2 14 1 4 32 32 16 129 <br /> Technical Word Processor $ 65 . 87 1 4 8 8 4 25 <br /> Clerical $42 .24 24 2 2 2 10 1 8 8 8 65 <br /> Subtotal Labor Hours 138 .0 54 . 0 99 . 0 32 .0 724 .0 90 . 0 304 .0 248 . 0 280 .0 190 . 0 2159 . 0 <br /> Labor Cost $ 15162 .96 $4J91 . 36 $62377 .21 $2,233 . 88 $ 50 109 . 64 $ 59649 , 19 $279655 .28 $22 640 . 72 $279027 . 92 <br /> $ 169273 .08 $ 177 921 . 24 <br /> Communications 3.0 % $454 . 89 $ 143 .74 $ 191 .32 $ 67 . 02 $ 19503 . 29 $ 169 .48 $ 829 . 66 $679 . 22 $ 810 . 84 $488 . <br />19 $ 5 , 337 . 64 <br /> 49935 . 10 6 , 568 . 53 $2 ,300 . 90 $519612 . 93 $ 59818 .67 <br /> Note : Communications includes cost of telephone calls to IRC , subcontractors, and field and professional GeoSyntec personnel , as well as <br /> facsimiles . <br /> XR05010 IRC MPIS-PM Sampling\R05000 I J-rev-Attachment B.xls Page 2 of 5 5/4/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.