My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-187
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2016 1:43:48 PM
Creation date
9/30/2015 8:48:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
05/24/2005
Control Number
2005-187
Agenda Item Number
14.B.3
Entity Name
GeoSyntec Consultants
Subject
Proposal Groundwater monitoring; Work Order No.1
Work Authorization No.01
Area
South Gifford Road Landfill
Supplemental fields
SmeadsoftID
4966
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants <br /> SUBCONTRACTORS <br /> Total Total <br /> DrillinglSurveying Unit Unit Cost Task 1 Task 2. 1 Task 2.2 Task 2.3 Task 2.4 Task 2.5 Task 3 Task 4 Task <br /> 5 Task 6 Units Cost <br /> Install 2-in . diameter well up to 50 fi ft 20 105 105 2 , 100 <br /> Install 2-in . diameter well to 100 ft ft $21 205 205 $49305 <br /> Install 6-in . surface casing ft $32 95 <br /> Flush mount surface completion each $90 3 3 $270 <br /> Above ground surface completion each $ 130 2 2 $260 <br /> Install 4-in PVC bollards each $ 50 8 8 $400 <br /> Development hr $55 2 <br /> Decon Procedures hr $50 6 6 $300 <br /> SPT ft $ 8 10 <br /> Permit fee each $ 100 1 <br /> Per diem day $ 150 4 <br /> Driller Mobilization quote $300 1 <br /> Drums each $40 25 <br /> Surveying Mobilization each $320 1 <br /> Surveying er well $35 18 18 $ 630 <br /> Drillin /Surve in Subtotal 139815 <br /> Total Drilling/Laboratory Costs arku 7 % $ 14 782 8 ,265 <br /> Note : <br /> 1 . Surveying costs include the collection of top-of-casing elevations for the 11 Targeted Brownfields Assessment Grant installed wells and <br /> the post source excavation well cluster. <br /> XR05010IRC MPIS-PM Sampling\R050001J-rev-Attachment B.xls Page 4 of 5 5/4/2005 ] <br />
The URL can be used to link to this page
Your browser does not support the video tag.