Laserfiche WebLink
GeoSyntec Consultants <br /> SUBCONTRACTORS <br /> Total Total <br /> DrillinglSurveying Unit Unit Cost Task 1 Task 2. 1 Task 2.2 Task 2.3 Task 2.4 Task 2.5 Task 3 Task 4 Task <br /> 5 Task 6 Units Cost <br /> Install 2-in . diameter well up to 50 fi ft 20 105 105 2 , 100 <br /> Install 2-in . diameter well to 100 ft ft $21 205 205 $49305 <br /> Install 6-in . surface casing ft $32 95 <br /> Flush mount surface completion each $90 3 3 $270 <br /> Above ground surface completion each $ 130 2 2 $260 <br /> Install 4-in PVC bollards each $ 50 8 8 $400 <br /> Development hr $55 2 <br /> Decon Procedures hr $50 6 6 $300 <br /> SPT ft $ 8 10 <br /> Permit fee each $ 100 1 <br /> Per diem day $ 150 4 <br /> Driller Mobilization quote $300 1 <br /> Drums each $40 25 <br /> Surveying Mobilization each $320 1 <br /> Surveying er well $35 18 18 $ 630 <br /> Drillin /Surve in Subtotal 139815 <br /> Total Drilling/Laboratory Costs arku 7 % $ 14 782 8 ,265 <br /> Note : <br /> 1 . Surveying costs include the collection of top-of-casing elevations for the 11 Targeted Brownfields Assessment Grant installed wells and <br /> the post source excavation well cluster. <br /> XR05010IRC MPIS-PM Sampling\R050001J-rev-Attachment B.xls Page 4 of 5 5/4/2005 ] <br />