Laserfiche WebLink
Himanshu Mehta P . E . <br /> 23 March 2009 <br /> Page 7 <br /> Task 3 . 3 . Baseline and Annual Monitoring Reports <br /> The baseline wetland monitoring report will be submitted to the SJRWMD on or before January <br /> 13 , 2010 . This report will include the following : <br /> • A diagram of the elevations , plant communities , and hydric soils located along each <br /> transect ; <br /> • A summary of the soils data collected ; <br /> • A summary of the vegetation data collected . This item will include a description of plant <br /> communities encountered along each transect and will provide a list of each species <br /> identified along the transects , grouped by plant community type . <br /> • A rain gauge map ; and , <br /> • Information regarding the installation of the monitoring wells , including a well <br /> completion report, latitude/ longitude coordinates of the well , well location on a map , and <br /> a brief site description . <br /> Annual monitoring reports (two ) will be submitted on or before March 31 of each respective <br /> ill provide identical data to that required in the baseline report and will <br /> year. These reports w <br /> also , include a summary of monitoring efforts , a discussion that compares current and historical <br /> monitoring data, graphs that illustrate/summarize rainfall , pumping volume , and other <br /> monitoring data ( including elevations of the wetland/upland interface ) . Finally , the annual <br /> reports will provide a brief discussion on data trends observed . <br /> BUDGET ESTIMATE <br /> A budget estimate for the scope of work outlined in Phase 1 through 3 of this proposal is <br /> summarized in the following table , and a detailed budget estimate is provided as Attachment 3 . <br /> The budget estimate does not include permit fees that will be required at the time <br /> the ERP <br /> application is submitted to SJRWMD . <br /> Phase 1 — General Consulting/Meeting Support/ Project Management $22 , 932 <br /> Phase 2 — Site Preparation $ 36 , 943 <br /> Phase 3 — Monitoring and Reporting $ 141 , 968 <br /> TOTAL $201 , 843 <br /> Geosyntec will not exceed the cost estimate without prior approval and written authorization from <br /> SWDD . <br /> NCP2009/XL09084/JL90075 . doc <br /> I M lcllhi lE I u;! ' <br />