Laserfiche WebLink
Geosyntec" <br />consultants <br />Mr. Himanshu Mehta, P.E. <br />Managing Director <br />Solid Waste Disposal District <br />Indian River County <br />132574 1h Avenue SW <br />Vero Beach, Florida 32968 <br />EXHIBIT 1 <br />2258 Riverside Avenue <br />Jacksonville, Florida 32204 <br />FH 904.388.8821 <br />FAR 904.388.8163 <br />www.goosyntec.com <br />11 July 2008 <br />Subject: Addendum No.1 to Work Order No. 16 <br />Proposal for Engineering Services <br />Design, Permitting, and Construction Services for Partial Closure of the <br />Infill Area and Segment 2 <br />Indian River County Class I Landfill <br />Vero Beach, Indian River County, Florida <br />Dear Mr. Mehta: <br />Geosyntec Consultants (Geosyntec) is pleased to submit this proposal to the Indian River County <br />(IRC) Solid Waste Disposal District (SWDD) for the provision of engineering services related to <br />the design, permitting, and construction of the partial closure of the Infill Area (Infill) and <br />Segment 2 (hereafter referred to as the Project) for the Class I Landfill at the IRC Landfill (IRCL) <br />facility located in Vero Beach, Indian River County, Florida. These services will be in addition <br />to engineering services currently approved under Work Order No. 16, related to the construction <br />procurement for the final closure of Segment 1 of the Class I landfill at IRCL. The proposal <br />presents the scope of work, schedule, and budget estimate for the design, permitting, construction <br />procurement, and construction -phase services for the Project. The proposal was prepared in <br />response to a written request to Geosyntec from the SWDD sent via email on 19 June 2008. <br />Geosyntec has prepared this proposal as Addendum No. 1 to Work Order No. 16 for the <br />Continuing Contract Agreement for Professional Services between IRC SWDD and Geosyntec, <br />dated 10 August 2004, amended on 11 August 2007. <br />The remainder of this proposal presents: (i) project background; (ii) proposed scope of work; <br />(iii) budget estimate; (iv) schedule; and (iv) the assumptions that were used in the development <br />of this proposal. <br />XR08168/JL80186.doc <br />engineers I scientists I innovators <br />.._. <t...�r �v ... x. .. r:4 w�. <br />�.$v.u—.. <br />k#i ♦:bio- <br />.m.. <br />rod$.�,k. <br />.d t c i <br />G�%1YV'.��H <br />i.li:}4�Ti. <br />cf LAS A�k�:{Sa '-.."L4�C"Y�iie <br />bPr['3TGk <br />CIRwn <br />.�. -i.. <br />