My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-123
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2016 12:16:32 PM
Creation date
10/1/2015 3:32:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/05/2009
Control Number
2009-123
Agenda Item Number
8.O.
Entity Name
Geosyntec Inc.
Subject
Work Order No.21 Underground Fuel Tanks
Area
Sheriff's Administration Building
Supplemental fields
SmeadsoftID
10617
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCC ENVIRONMENTAL. SVS, INC. <br /> 340 SW JASMINE AVE. <br /> KEYSTONE HEIGHTS, FL 32656 <br /> SCHEDULE OF PRICES - SHERRIF' S OFFICE UST CLOSURE <br /> si <br /> Bid Item Extended <br /> # item Description Unit Unit Rate Quantity Cost: <br /> Fill out and submit Underground Storage Tank Installation and Removal Form for Certified <br /> 2. 14 Contractors, July 13 , 1898 [62J61 . 800(5) FAC] to Geosyntec LS $ Oc) <br /> 2415 Contingency units for additional cost of a vacuum truck if needed HR $ <br /> W 2. 16 lContingency units for additional square foot of concrete finished surface I SQ FT I Is <br /> of <br /> m 3 AST S em <br /> # Systems (with manufacturer provided pre-cast concrete pad and equipped with dispenser <br /> In 5 . 1 systems) LS $ W� <br /> Lt1MP SUM TOTAL I LS I Is 9 <iD •— <br /> Notes: <br /> 0 1 . LS Items to be reimbursed following completion of specific tasks in accordance with the specifications. <br /> U) 2 . SUBCONTRACTOR is responsible for soil/debris transportation to IRC Class I Landfill , disposal fees will be directly billed to <br /> IRC Utilities. <br /> c <br /> 3. The SUBCONTRACTOR bid shall include written assurance that SUBCONTRACTOR will comply with the applicable trench safety standards, <br /> v <br /> a <br /> r <br /> 0 <br /> L <br /> C <br /> W <br /> U <br /> U <br /> 2 <br /> tL <br /> S' <br /> m <br /> 0 <br /> m <br /> 0 <br /> N <br /> Page 2 of 2 <br /> L <br /> >Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.